EKOenergy label is not fully equivalent to Green-e certification?CI-v4.1 EAc4: Renewable energyposted by Michael on Jul 8, 2024, 5:32 am
Hi LEED Experts, My project in Malaysia and we purchased... Last reply: Steven Vanholme, Aug 28, 2024, 5:30 am |
|
Could the APX TIGR Certification be considered as equivalent to Green-e Certification for RECs?CI-v4.1 EAc4: Renewable energyposted by Wanhong Lyu on Aug 3, 2022, 4:57 am
Hi, everybody, I'm working on a LEED CI project in China, and consider to purchase the RECs for "Tier 3: Off-site... Last reply: Marcus Sheffer, Aug 8, 2022, 10:30 am |
|
Non-electric and electric energy use for the Renewable Energy credit version 4.1CI-v4.1 EAc4: Renewable energyposted by Ana Maria Escobar Cardenas on Jul 22, 2020, 9:16 am
Hello! I am doing a substitution of the Renewable Energy (Green Power) credit to version 4.1 for a Commercial Interior project. Last reply: Boone Jones, Sep 15, 2020, 1:24 pm |
|
Substituting in EAc4 v4.1 on a v4 Project- Category Points AvailableCI-v4.1 EAc4: Renewable energyposted by Tim Bush on Apr 16, 2020, 6:29 am
I have a v4 project which is looking at substituting in the v4.1 version of EAc4 Renwable Energy Production. EAc4 v4.1 has 6 points available, more than the 5 points available for EAc4 and... Last reply: Tim Bush, Apr 19, 2020, 8:17 pm |
|
Confirmation of maximum point scoring and points tableCI-v4.1 EAc4: Renewable energyposted by Han Qiang Ler on Jul 17, 2019, 10:02 pm
There appears to have a discrepancy in the guide dated 04_09_2019 version. The credit scorecard shows 6 points as maximum point, but the specific section mentioned that this is a prerequisite and... |