Log in
Forum » CI-v4.1 IPc1
Topic

4.1 calculators

CI-v4.1 IPc1: Integrative process
posted by Kena David on Apr 16, 2019, 4:40 pm

Has anyone been able to access updated v4.1 credit calculators? Is there any guidance on using new calculators versus v4 calcs at this point?

Last reply: Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C, Jan 23, 2023, 1:00 pm

Clarification of requirements

CI-v4.1 IPc1: Integrative process
posted by Josée Lupien on Jun 6, 2022, 10:51 am

Hello,

Option 1 (Option 1. Energy- and Water-Related Systems) is not so clear, especially discovery phase "Choose two of the following to analyze: Energy-Related Systems ; Water-Related...

Last reply: Marcus Sheffer, Nov 29, 2022, 12:58 pm

Letter

CI-v4.1 IPc1: Integrative process
posted by Aleksandra Suchomska on Aug 30, 2022, 9:55 am

Hi,

my team is doing the integrative process letter for the first time. How long should it be? How detailed should be the description of each analyzed area? 

Last reply: Marcus Sheffer, Sep 2, 2022, 3:26 pm

Submit Option 2 for a base building with certification pending??

CI-v4.1 IPc1: Integrative process
posted by Erica Downs on Sep 25, 2019, 2:09 pm

Our CI project would like to follow v4.1 Option 2: Select a LEED Certified Building.  The CI project is located in a LEED-registered C&S project, but the...

Last reply: Courtney Royal, Oct 16, 2019, 11:57 pm

LEED v4.1

CI-v4.1 IPc1: Integrative process
posted by Mohamed Hassan on Jun 16, 2019, 1:09 pm

Are the (REFERENCE GUIDE FOR INTERIOR DESIGN AND CONSTRUCTION v4.1) are Available in store?

what is the last date to subscribe project on Version v4 ?and last date to be certificated AP on...

Last reply: Dave Hubka, Jun 17, 2019, 1:34 pm