Forum quick links
Stormwater Treatment Offsite by Municipality
NC-v4 WEp1:Outdoor water use reductionposted by Maya Facciolo on
Our project is located within the Fresno Metropolitan Flood Control District (FMFCD) in California, which provides regional stormwater treatment and discourages on-site water quality treatment.
Luminaries inside parking cover are exterior lightings?
NC-v4 SSc6:Light pollution reductionposted by Thomas Tan on
Dear All,
I have a large parking structure (on grade) located inside the project site.
Pilot Credit INpc155
Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Controlposted by Roxanne Button on
Has anyone attempted this Pilot Credit yet? Our project is a college science building which was under construction during the COVID-19 shutdown, and already incoporates most of the requiremen
REACH compliance
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Charline SEYTIER on
Hello,
Exterior Lighting for LEED ID+C
CI-v4.1 EAc2:Optimize Energy Performanceposted by Alvin Michael Velasco on
Hi.. We are working on a LEED CI project where 100% of the building spaces are part of the LEED scope. In this scenario, are exterior lightings required to be included in the energy model?
Change to CxA Scope
NC-v4 EAp1:Fundamental commissioning and verificationposted by Adrienne Franz on
Hello,
Project with mix of New Construction and Alterations
posted by Kent B on
The project is an elementary school project with four buildings on the site.
1) Building A: main elementary building. Building is being fully replaced.
V5: requirements for EPDs
NC-v4.1 MRc2:Environmental Product Declarationsposted by Gary Soe on
Hi all,