Electrical service requirement for dual port Level 2 chargersCS-v4.1 LTc8: Electric Vehiclesposted by Natalie Terrill on Apr 8, 2022, 12:27 pm
The current language requires a Level 2 charging capacity with 208-240 volts or greater for each space. In the past we've installed conduit and wiring for dual chargers (1 charger using... Last reply: Andrea Vickers, Jan 31, 2023, 10:56 am |
|
Electric vehicles supply equipmentsCS-v4.1 LTc8: Electric Vehiclesposted by Helena Garcia on Nov 7, 2022, 7:44 am
Would it be possible to count electric motorcycles as electric vehicles as well? Or, as electric vehicles, only cars and vans are valid? |
|
Does the paring now have to be on-site?CS-v4.1 LTc8: Electric Vehiclesposted by Maria Porter on Aug 12, 2021, 4:19 am
I have had many projects in v2009 that have had their parking in a neighboring garage if they don’t have their own garage. I have ongoing projects in v4 with the same situation. But somebody just... Last reply: Maria Porter, Aug 12, 2021, 4:23 am |
|
Combine EVSE with EV ReadyCS-v4.1 LTc8: Electric Vehiclesposted by Norbert Szircsak on Dec 22, 2020, 4:42 am
Dear All, Do you think you can combine the number of actual EVSE and the number of EV Ready spaces? I mean let's say 3% of parking spaces with EVSE and 7% additional EV Ready. ...Last reply: Norbert Szircsak, Dec 22, 2020, 8:57 am |