Forum quick links
LEED V4 NC Healthcare project EAc2 points table guidance?
NC-v4 EAc2:Optimize energy performanceposted by Aditya Potipireddi on
Hello All,
Insulated Metal Panel
NC-v4 EQc2:Low emitting materialsposted by Erin Holdenried on
Any thoughts how an insulated metal panel would (or would not be included) in the credit for the Option 1 path? I assume is would not need to be included as it is a factory-finished metal pro
New Thermal Comfort Tool
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Christopher Schaffner on
Just received an email about a new tool that may be helpful for teams pursuing this credit: The Center for the Built Environment has developed a web-based thermal comfort tool, which is now availa
Previous Owner to Demolish Building Prior to Our New Owner Taking Control
NC-v4 MRp2:Construction and demolition waste management planningposted by Steven Blais on
Our client is negotiating to lease or acquire property to construct new facilities.
Sound Isolation for Regularly Occupied space next to an Electrical room
NC-v4 EQc9:Acoustic performanceposted by Jill Kurtz on
If I have an conference room (occupied area) next to an electrical room, do I...
The fan power consumption calculation of PSZ-HP system
Retail-CI-v4 EAp2:Minimum energy performanceposted by JAMES CHEN on
questions:
1. Our current total area of the model: Total Building Area: 191.5 m2, Net Conditioned Building Area: 141.90, Unconditioned Building Area: 49.60m2, 2 Floor
Work flow questions
posted by Shane Totten on
Hi, all. We missed you at the standing check in today. We have a couple of questions for the BG team:
Cutsheets for steel products
NC-2009 MRc4:Recycled Contentposted by Raquel Clemente on
In our project it is possible to achieve 30% recycled content only considering the default 25% recycled content value for steel structural products. My question is if we must provide cutsheets for
Fenestration - Baseline vs. Proposed
NC-v4 EAp2:Minimum energy performanceposted by Fábio Batista on
Hi all,
I have 3 questions to ask:
1.
Documentation for Material Reuse?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Megan White on
What is required for documentation of material reuse? In the Ref Guide (p.535), it says projects should track original location of the material before remove.