Transitioning from CHPS to LEED for Schools
posted by Cynthia Kaplan on
Hi all!
Whether to just upload the Tables of contents for Fundamental Cx documentation review?
NC-v4 EAp1:Fundamental commissioning and verificationposted by zz kelvin on
When a document is submitted for review, is it understood that only the tables of contents needs to be uploaded, and the detailed document content does not need to be uploaded?
Submittals
Pilot-Credits MRpc131:Circular Productsposted by POLYMNIA GKEKA on
Hello fellow forum users,
Renovation of existing building with no major site work planned
NC-v4 WEp1:Outdoor water use reductionposted by Mike Workman on
Our project is a complete interior renovation of an existing facility on a college campus.
LEED Certification of a Central Utility Plant Building
NC-v4 EAp2:Minimum energy performanceposted by Eric Dixon on
My team is designing a Central Utility Plant building that will house a DES which will serve several campus buildings thermal energy demand.
Cumulative Points
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Catarina Costa Goncalves on
Can we still target this credit even if we do not get full points under indoor water use reduction credit?
Attempting Indoor Water Use Reduction Credit using minimal plumbing fixtures that serve occupants outside of the project space
CI-v4 WEc1:Indoor water use reductionposted by Edgar Arevalo on
I seem to have a unique problem. My project is a lab/office space that is occupying half of a floor in a building.
INpc 137 Safety First: Cleaning your space for emerging pathogens
NC-v4 INc1:Innovationposted by Glen Boldt on
What are some other testing strips that are readily available to test the cleanliness of a surface?
Overall credit experience
Pilot-Credits EQpc116:Daylight in nonregularly occupied spacesposted by Valeria Fiorentino on