Forum quick links
Prerequisite Required Documentation
NC-v4 EAp3:Building-level energy meteringposted by Danilo Ilic on
What constitutes "Confirmation of permanently instaled meters" in the required documentation part?
Not complying with Smoking ban
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Wioletta Simlat on
Hi all,
Baseline HVAC System Type
NC-2009 EAp2:Minimum Energy Performanceposted by Michael Hammond on
Hi all,
Toilets: private or public?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
In a office building that is occupied by a private firm how shall be considered the toilets according to Table 6.4 of ASHRAE 62.1-2010? Private, since the property is private? Does it depend on the
Fourth National Climate Assessment Report
posted by Mary Ann Lazarus on
Hi: SD Leaders. It was so nice to see so many of you at Greenbuild in Chicago.
About IT load influenced by project (%)
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by DAVE LI on
Hi Everybody,
Quality Views for Non-Regularly Occupied Spaces
CS-v4 INc1:Innovationposted by Lauren Wallace on
Our project is a cold dark shell restaurant space located in a park location.
Appeal Design Credits during Construction Prelim Review
posted by Danielle Dunn on
I have two credits from my design final review that were denied. However, we would like to submit our credits for construction prelim review.
CO2 Monitoring in Telephone Rooms
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Sue Clark on
I am working on a project with a number of small quiet rooms. These rooms are approximately 35sf and their purpose is to provide privacy for individuals during phone calls.