Forum quick links
anhydrite board with cellulose fibers
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Agnieszka Rylska on
Hello,
G3.1.1 | Exception b (40 equivalent full-load hours per week)
CS-2009 EAp2:Minimum Energy Performanceposted by Danilo Ilic on
From what I could see in related posts, "40 equivalent full-load hours per week" are plainly interpreted as 40 working hours and without any connection to thermal load and I am not
SD Leaders 2019 Salary Survey
posted by RoseAnn Grimes on
It’s here! By popular demand we’re re-running the SDL Salary Survey that we last ran in 2015.
Residential project water fixtures and appliances water use
CS-v4 WEc2:Indoor water use reductionposted by Andrzej Gutowski on
Dear collegues,
E-Waste - Safe recycling
CI-v4 MRp1:Storage and collection of recyclablesposted by Peter Elliott on
Our IT department bids used computers, monitors and servers to e-waste liquidators. Is this considered an acceptable and safe recycling method for e-waste?
Existing Building Undergoing renovation
posted by Olinayaki S on
What is the acceptable percentage of renovation to consider a project is EBOM when the existing building is undergoing renovation?
Tenant lighting savings without layout
CS-v4 EAp2:Minimum energy performanceposted by Przemysław Rejczak on
Dear Everyone,
Generaly for CS project we model tenant spaces as unfinnished and we use perimeter/core zonning method.
Female Bidets in LEED calculation?
NC-v4 WEp2:Indoor water use reductionposted by Hieu Huynh on
Hi LEED experts,
Glare-control devices - glazed doors?
CI-v4 EQc7:Daylightposted by Victoria Watson on
Hi - When the user guide says "provide glare-control devices for all transparent glazing" does it really mean all? I am assuming it doesn't mean high volume doors with transparent gl