Forum quick links
Campus project with central plants serving several buildings
NC-v4 EAp2:Minimum energy performanceposted by Yoyo Shek on
Hi All,
Our project composed of several buildings which share a group of main central plants (including several chillers and cooling towers).
Does below approach correct?
Fresh air for toilet vestibule according to ASHRAE 62.1-2010
CS-2009 EAp2:Minimum Energy Performanceposted by Przemysław Rejczak on
Dear Everyone
Can a single room have 3 View Types because of different window views?
NC-v4 EQc8:Quality viewsposted by Danielle Waters on
The project is a fort dormitory where each suite has three windows -- one to the outdoors, second facing another window / outdoors, and third facing into a courtyard/lightw
PI Form 1, Must Use a Reasonable Site Boundary
NC-2009 PIf1:Minimum Program Requirementsposted by Vincent Pieri on
Our project is registered as a single LEED NC 2009 building located on a previously developed site abutting an existing LEED certified and non LEED certified building site at the North boundar
Soil restoration and testing
NC-v4 SSc2:Site development - protect or restore habitatposted by Lyle Axelarris on
I'd like to hear from project teams who have successfully pursued this credit. Is the soil testing actually required or is it a means to an end?
Rainwater Harvesting / Domestic Hot Water
NC-v4.1 WEc4:Water Meteringposted by Michael Kelly on
1) Does rainwater harvesting count as a sub system to be metered?
2) Does metering the domestic hot water system mean tracking water usage or energy usage?
Products with a critically reviewed LCA
NC-v4.1 MRc2:Environmental Product Declarationsposted by Maggie Wildnauer on
From reading the wording on the first option, for a critically reviewed LCA, it doesn't appear that a company needs to be explicitly recognized as a participant in the LCA - is this true?
Lighting Power Modeling for Core and Shell Building
CS-v4 EAp2:Minimum energy performanceposted by Saif Alsaeed on
Hi,
Beginner needing info on accredited business
Homes-v4 MRc2:Environmentally preferable productsposted by Lucy Grabenstein on
If anyone can point me in the right direction I would be grateful!
Lab Methods
NC-v4 EQc4:Indoor air quality assessmentposted by Nate Maniktala on
I like using canister collection TO-15 for the simplicity, but it appears TO-17 thermal desorption is required for this credit?