Innovation Credit: Walkable Project Site

CI-v4 INc1:Innovation
posted by  Patty Lloyd  on 

The base building achieved this, which was seeking LEED v3 CS. At that time it was pilot credit SSpc14.

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Mon Nov 4, 2019, 8:43 am
2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Fri Nov 1, 2019, 5:49 pm
4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Nov 1, 2019, 7:56 am

recyclable storage area outside the boundary

NC-v4 MRp1:Storage and collection of recyclables
posted by  Larissa Murakami  on 

Would it be possible to use an area outside the boundary for the recyclable storage area?

4
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Thu Oct 31, 2019, 8:30 pm

Using EMS to calculate some End-Use Energy

NC-v4 EAc3:Advanced energy metering
posted by  Melissa Crowe  on 

Hi All

We have metering set up for most of the end-uses that represent over 10% of total energy but for some equipment is it not cost effective or practical.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Oct 31, 2019, 8:03 pm

LTc5 Quality Transit - is and exemplary performance path avaiable?

CS-v4.1 LTc5:Access to Quality Transit
posted by  Susan Di Giulio  on 

We have a LEED-CS project adjacent to a major regional transit hub and it is actually possible that we could double the 360 wkday trips/216 wkend trips required for 6 points.

1
Thu Apr 30, 2020, 3:26 pm
5
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Thu Oct 31, 2019, 7:25 pm

Option 2 - Is there still a minimum sample area requirement?

NC-v4 EQc4:Indoor air quality assessment
posted by  Daniel Smith  on 

I am quoting to provide Option 2 IAQ testing for my first V4 BD+C project.

2
President
Doo Consulting LLC
LEEDuser Basic Member
136 thumbs up
Thu Oct 31, 2019, 9:47 am