Cx completion and LEED submissions

CI-v4 EAc1:Enhanced commissioning
posted by  Erin Rowe  on 

Two questions. 1) We are going for all commissioning points on a LEED V4 CI project.

0

Cx completion and LEED submissions

CI-v4 EAc1:Enhanced commissioning
posted by  Erin Rowe  on 

Two questions. 1) We are going for all commissioning points on a LEED V4 CI project.

1
Thu Sep 21, 2017, 6:18 pm

Change to Cx agent

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Cindy Quinn  on 

I'm working on a v4 project currently in CD design phase.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Sep 14, 2017, 1:13 am

Option 2. Third-Party Utility Reporting (1 point)

Homes-v4 EAc5:HVAC Start-Up Credentialing
posted by  Robert Grimard  on 

 

Hi,

I'll soon be the proud owner of a small house in Quebec, Canada and I need clarification on this Option 2 of th Advanced utility tracking. It says:

0

New versions of AgBB - acceptable for showing compliance?

NC-v4 EQc2:Low emitting materials
posted by  Reinhard Oppl  on 

Hello, the credit allows non-US projects to accept products as low-emitting if these are compliant with AgBB (2010), even though the low formaldehyde requirement on top of AgBB compliance unfortuna

6
Independent consultant on VOC issues
formerly with Eurofins Product Testing A/S
LEEDuser Basic Member
246 thumbs up
Wed Sep 13, 2017, 7:51 pm

25 feet

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Lawrence Lile  on 

We are certifying a building for a City that has an ordinance stating "no smoking within 20 feet of building entrances" for all City property.  The City representative is reluctant to put up a

0

No parking

CS-v4 LTc7:Reduced parking footprint
posted by  Mike D  on 

Can this credit be achieved if there are no parking spaces provided?

4
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Wed Sep 13, 2017, 5:12 pm

ASHRAE Level II Audit qualification

EBOM-v4 EAc1:Existing building commissioning—analysis
posted by  Alexa Stone  on 

Can an ASHRAE Level II Audit conducted in 2014 qualify for usage for this credit?

5
Founder & Senior Consultant
Viable LLC
LEEDuser Premium Member
12 thumbs up
Wed Sep 13, 2017, 4:44 pm

Daylight Analysis

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  SAMY Chamy  on 

Dear All we have done daylight analysis for factory building. we get daylight of 85% in 9 AM and 73 % in 3AM (Date -21 - September) In this case which value we take to enter in V2009 Spread shee

13
Default Avatar
Sustainable Design Director
Bell Architects
LEEDuser Premium Member
41 thumbs up
Wed Sep 13, 2017, 4:18 pm

Total construction cost

CS-2009 MRc4:Recycled Content
posted by  Agnieszka Rylska  on 

Should the excavation work cost be included in the total contruction cost (while using the default cost of materials equal to 45% of total construction costs)?

3
Wed Sep 13, 2017, 3:01 pm