Forum quick links
Cx completion and LEED submissions
CI-v4 EAc1:Enhanced commissioningposted by Erin Rowe on
Two questions. 1) We are going for all commissioning points on a LEED V4 CI project.
Cx completion and LEED submissions
CI-v4 EAc1:Enhanced commissioningposted by Erin Rowe on
Two questions. 1) We are going for all commissioning points on a LEED V4 CI project.
Change to Cx agent
NC-v4 EAp1:Fundamental commissioning and verificationposted by Cindy Quinn on
I'm working on a v4 project currently in CD design phase.
Option 2. Third-Party Utility Reporting (1 point)
Homes-v4 EAc5:HVAC Start-Up Credentialingposted by Robert Grimard on
Hi,
I'll soon be the proud owner of a small house in Quebec, Canada and I need clarification on this Option 2 of th Advanced utility tracking. It says:
New versions of AgBB - acceptable for showing compliance?
NC-v4 EQc2:Low emitting materialsposted by Reinhard Oppl on
Hello, the credit allows non-US projects to accept products as low-emitting if these are compliant with AgBB (2010), even though the low formaldehyde requirement on top of AgBB compliance unfortuna
25 feet
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Lawrence Lile on
We are certifying a building for a City that has an ordinance stating "no smoking within 20 feet of building entrances" for all City property. The City representative is reluctant to put up a
No parking
CS-v4 LTc7:Reduced parking footprintposted by Mike D on
Can this credit be achieved if there are no parking spaces provided?
ASHRAE Level II Audit qualification
EBOM-v4 EAc1:Existing building commissioning—analysisposted by Alexa Stone on
Can an ASHRAE Level II Audit conducted in 2014 qualify for usage for this credit?
Daylight Analysis
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by SAMY Chamy on
Dear All we have done daylight analysis for factory building. we get daylight of 85% in 9 AM and 73 % in 3AM (Date -21 - September) In this case which value we take to enter in V2009 Spread shee
Total construction cost
CS-2009 MRc4:Recycled Contentposted by Agnieszka Rylska on
Should the excavation work cost be included in the total contruction cost (while using the default cost of materials equal to 45% of total construction costs)?