Forum quick links
Patty Lloyd (Personal Introduction)
posted by Patty Lloyd on
Good Morning, I have so enjoyed reading everyone’s personal introductions.
partial credit?
CI-v4 IPc1:Integrative processposted by Dana Piper on
If the tenant is remodeling existing space or the move location is predetermined, is it possible to get 1 of 2 points if we start in pre-design and look at energy and plumbing systems?
Agricultural land as previously developed land.
ND-v4 SLLp1:Smart locationposted by Kaushaveer Ghoora on
Can we consider land under agricultural use (e.g. surgarcane cultivation) as previously developed land?
30% female 70% male for Police facility FTE
NC-v4 MPR3:Must comply with project size requirementsposted by Lawrence Lile on
We are working on a police facility under LEED V4. Currently the department is 12% female. Nationally, police departments, according to a study we will cite, are 14% female. We ar
LBC Materials cost premiums?
posted by Sarah Cutsforth on
Hi All- I'm posting this question for my ZGF colleague Chris Chatto. Somehow he wasn't initially included on the SDL list as it moved from Wiggio to BuildingGreen's (Green Gurus) site.
Material Reuse
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by SAMY Chamy on
Dear Concern:-
LEED - EBOM
EBOM-v4 MPR3:Must comply with project size requirementsposted by SAMY Chamy on
Dear Concern:-
Existing Data centre MPR Enquiry
LEED - EBOM Data center
EBOM-v4 MPR3:Must comply with project size requirementsposted by SAMY Chamy on
Dear Concern:-
Existing Data centre MPR Enquiry
Switching from Appendix A to Table 6-3 to calculate Ev
CI-2009 IEQp1:Minimum IAQ Performanceposted by Edgar Arevalo on
I am using an old 62MZ calculator file to do comply with the IEQp1 prerequisite. However, after adjusting the ventilation rates for peak heating mode, Ev cannot be calculated on the spreadshe