Forum quick links
Baseline System 8
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, Just a small clarification about the heating plant of System 8. It is written that heating is Electric resistance.
CalGreen vs LEED
posted by Gaston Viau on
yellow bars on credit page?
posted by Carrie Laurendine on
im working in the relatively new leedonline for the first time in a while. on the credits 'tab' - some of the credits are shown with a yellow/cream colored highlight.
Solar Energy
NC-2009 EAc2:On-Site Renewable Energyposted by SAMY Chamy on
Dear Al:- Our project have 50 kWp Grid connected solar panel system with out battery back up.
Windows complying ASHRAE 90.1-2007
CS-2009 EAp2:Minimum Energy Performanceposted by Paula Hernandez on
Hello, We have a building which is going under major renovations, one of the most important is replacing old operable windows by new windows with new frames and glasses.
Determination of 2 year energy consumption
NC-2009 EAc6:Green powerposted by Jordan Kirrane on
Hi there, My project wishes to calculate the GWh of green power required for compliance via the company's standard calculation procedure.
What is considered "individual energy end use"?
NC-v4 EAc3:Advanced energy meteringposted by Dave Hubka on
My project is a manufacturing building where the "widget makers" consume about 75% of the total annual energy.
Reduced Mercury Content
CI-2009 IDc1:Innovation in Designposted by Lou Niles II on
Hello, We have multiple projects in LEED v2009 for which we could earn this ID Credit and point for but the process of documentation seems quite ridiculous using the EBOM method of "required" or no
Compliance with ANSI/BIFMA e3-2012?
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Bernardo Ruiz Montoya on
Hi, I'm currently working on a project that installed furniture systems with procedure certificates ANSI/BIFMA e3-2012.
Bicycle storage for whole building occupants, but no reservation
CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by ruifei gao on
We are doing a project where the base building has enough bicycle places for the whole building occupants to use, but no bicycle places can be specifically reserved for any tenant.