On-going Commissioning

EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioning
posted by  Tracy Smith  on 

We have already been awarded EAc2.1 and EAc2.2. To get these points we did a retro commissioning report. When we resubmit, we are considering going for EAc2.3.

3
Tue Jun 23, 2015, 4:09 pm
2
Default Avatar
Owner
Nicolas M Pacella & Associates
LEEDuser Basic Member
3 thumbs up
Mon Jun 22, 2015, 7:40 pm

Multiple Buildings Project Certification

NC-2009 PIf1:Minimum Program Requirements
posted by  Mario S.  on 

We have a project with 3 buildings located on the same plot, that are physically attached by two underground levels made up of technical rooms, parking spaces, bicycle racks, showers and garbage ro

3
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Mon Jun 22, 2015, 2:59 pm

Installed HVAC equipment is less efficient than simulated.

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Gustav Alfaro  on 

Hi to all: At the end of the project and after the leed design submittal was reviewed and approved, we found that some of the equipment that have been installed in our project are less efficient t

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Mon Jun 22, 2015, 2:46 pm

Street versus Alley

ND-Plan-v4 NPDc6:Connected circulation network
posted by  Martine Desbois  on 

Please could you clarify the definition of an alley. For the purpose of connectivity are alleys and streets treated the same way.

3
Sun Jun 21, 2015, 10:01 pm

Educational program- Case study?

NC-2009 IDc1:Innovation in Design
posted by  Diaa Madkour  on 

Hi all, on the reference guide P.596, there are 5 components to pick 2 initiatives.

3
Default Avatar
Tetra Tech
LEEDuser Basic Member
3 thumbs up
Fri Jun 19, 2015, 7:38 pm

Reconstructing a floor to account for sea level rise

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Deborah Lucking  on 

Our project is required (by code) to raise the elevation of the ground floor slab, to account for future sea level rise.

2
Default Avatar
LEED Consultant
The Green Engineer
LEEDuser Basic Member
188 thumbs up
Thu Jun 18, 2015, 8:17 pm

educational/office building project

General forums
posted by  Courtney Royal  on 

can any help me find the avg. peak parking demand of an office building? i just can't see myself asking the project to purchase this report just for one simple number! thanks so much, Courtney

9
Sr. Sustainability Consultant
Taitem Engineering
LEEDuser Basic Member
36 thumbs up
Thu Jun 18, 2015, 8:15 pm

Adding floors to existing building, plus addition

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Erica Downs  on 

Our project is reusing an existing church, and adding an adjacent 4-story wing, with a connector in the middle.

6
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Thu Jun 18, 2015, 7:34 pm

LEED Volume Program - Submittal Guidance

Forum for LEED Volume Program Certification
posted by  Grace Ming  on 

Hello all, I am looking for the following documents regarding the LEED Volume certification: 1) LEED Volume Program: Submittal Guidance for Design and Construction 2) LEED Volume Program: Submit

5