Forum quick links
V4 Advanced Energy Metering Template is Protected
NC-v4 EAc3:Advanced energy meteringposted by Steven Wychorski on
Hello The USGBC approved Data template for Building Energy Metering is locked/protected. It only has 2 meter tabs. My project has 60+ different meters to input.
Sounds transmission - Ceilings and Floors
NC-v4 EQc9:Acoustic performanceposted by Adam Stoker on
The LEED v4 acoustics calculator expands on the guidance provided in the credit and reference guide with respect to the sound transmission requirements and associated calculations.
Determining STC ratings for ceiling products
NC-v4 EQc9:Acoustic performanceposted by Adam Stoker on
The LEED v4 acoustics credit addresses sound isolation purely through composite STC ratings. In my research, I have struggled to find STC ratings for ceiling products.
Phenol Formaldehyde (PF) Resins OK with v3?
CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Brian Salazar on
The CI forum seems to have more traffic, so I am reposting here from CS.... Hello - I am working on a project where the subcontractor has requested we approved a product that uses a WBP Phenolic F
EBOM V4- IPM
Hospitality-EBOM-v4 EQc9:Integrated pest managementposted by VISHESH AGARWAL on
For Pursing the option-1. In house IPM Policy: is it mandatory to use the SF Tier-III Pesticide or use government approved pesticide.
Ongoing purchasing and waste policy
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by VISHESH AGARWAL on
Thanks in advance can any share the link of LEED V4 Ongoing purchasing and waste policy Tempelate.
Commingled or Source Separated
NC-2009 MRc2:Construction Waste Managementposted by Risto Beatty on
Could someone please help define the meaning of 'source separated' in terms of the Material Stream credit calculator?
Pilot Credit Closed?
Pilot-Credits IPpc88:LEED O+M Starter Kitposted by Angela Wisely on
It appears this pilot credit closed on August 16th. I believe I can still submit it as long as I registered under the pilot credit before that date, correct?
PTAC Monitoring
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Dutchie Grossweiner on
In a mixed use building, the residential dwelling units are being provided outdoor air via PTAC systems (apartment size determines the number of PTAC units).
LEED Rating System Transition to LEEDv4 / Campus Registration
posted by Ali Scander on
Hello, I'm working on a LEED 2009 project which will require a Campus registration on LEED Online.