Helps with operationsPilot-Credits INpc125: Inclusive Designposted by Husam Haron on Oct 22, 2024, 4:22 am
Just sharing. We're working on a campus with several data center buildings. When the idea of Inclusive Design (called "universal design" - UD in my country) was proposed, there were... Last reply: Nadav Malin, Oct 24, 2024, 6:24 am |
|
Pilot Inclusive DesignPilot-Credits INpc125: Inclusive Designposted by Laurie Johnson on Mar 14, 2024, 2:05 pm
I am working on a LEED CI and WELL at Scale project. I am using an approved C13.1 Accessibility and Universal Design: Integrate Universal Design WELL feature as a crosswalk for the LEED Pilot... Last reply: Bjorn Hansen, May 27, 2024, 3:38 am |
|
Clear opening width for doorsPilot-Credits INpc125: Inclusive Designposted by Jennifer Atherton on Feb 3, 2023, 12:50 pm
Hello, Does the requirement for 0.91 meter wide interior doors refer to the minimum effective clear width through the doorway? |
|
Inclusive Design O&M Training ManualPilot-Credits INpc125: Inclusive Designposted by Kelli Kimura on Apr 28, 2022, 12:33 pm
Hi everyone, Was curious if anyone has put together or has found a good example of an inclusive design-focused training manual that they are able to share? Our team is interested in this... |
|
Inclusive Design Pilot CreditPilot-Credits INpc125: Inclusive Designposted by CodeGreen Solutions on Jun 20, 2019, 4:16 pm
Pilot Credit Registration Required Post: Our project chose to pursue this credit because creating a safe, inclusive space for all employees and visitors was very important to the project owners.... Last reply: Margaret Montgomery, Mar 15, 2021, 8:30 pm |
|
T-shaped Space Alternative?Pilot-Credits INpc125: Inclusive Designposted by Kristi Ennis on Nov 8, 2019, 4:31 pm
#1 Physical Access proposes that the size of the turning space be increased to a 6' diameter (in lieu of 5'). Has there been any discussion about the size of an alternative T-shaped turning space... Last reply: Emily Purcell, Nov 11, 2019, 10:37 am |