Wed Jan 10, 2018, 2:37 pm
Which flow rates to use?
NC-v4 WEp2:Indoor water use reductionposted by Nate Tsang on
Hi all, The prerequisite lists the baseline flow rates at 60psi (415 kPa). Does this mean that the proposed flow rate must also be at 60psi?
5
Wed Jan 10, 2018, 2:20 am
Solid Untreated Wood Window Sills
NC-v4 EQc2:Low emitting materialsposted by Alara Brinton on
We have a project installing solid wood, (untreated) for the window sills & some baseboards.
11
Wed Jan 10, 2018, 12:01 am
Signage at Equipment Rooms with Exterior-Only Access
NC-v4 EQp2:Environmental tobacco smoke controlposted by Stephanie Graham on
My project is a fleet maintenance garage with storage. Per prerequisite requirements we are providing the no-smoking signage at all building openings including intakes, overhead doors and oth
2
Tue Jan 9, 2018, 5:51 pm
IPMVP Option D+ PV System
NC-2009 EAc5:Measurement and Verificationposted by Nasim Mirian on
Hello,
1
Tue Jan 9, 2018, 6:04 pm
1
Fri Jan 12, 2018, 12:37 am
Waste-to-Energy
NC-v4 MRc5:Construction and demolition waste managementposted by Lise Dannesboe on
Hi
1
Tue Jan 9, 2018, 6:27 pm
2
Tue Jan 9, 2018, 4:51 pm
Using a weighted average to document exemplary performance
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Sara Goenner Curlee on
The hardscape for my project is mostly white concrete. However, in some areas the white concrete is edged by colored concrete which has SRI values outside the allowable range.
5