Topic

No Cooling Tower ACP Feedback

Pilot-Credits WEpc94: No Cooling Tower
posted by on Mar 25, 2024, 4:02 pm

I found this pilot credit to be a great way to allow projects to earn credit for the design choice of choosing not to utilize cooling towers on the project even for buildings that are large...

Last reply: David Krisa, Jun 11, 2024, 6:45 pm

Pilot Closed- attending LEED v4.1 Optimize Process Water Use

Pilot-Credits WEpc94: No Cooling Tower
posted by Adriana Hansen on Apr 16, 2024, 1:45 pm

This pilot credit has been used in many office projects with VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1...

Pilot Closed- attending LEED v4.1 Optimize Process Water Use

Pilot-Credits WEpc94: No Cooling Tower
posted by Adriana Hansen on Apr 16, 2024, 1:39 pm

This pilot credit allows to many office buildings that have a VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1...

NC Building with no cooling tower

Pilot-Credits WEpc94: No Cooling Tower
posted by Paula Hernandez on Aug 2, 2023, 2:26 pm

Hi, I think that this is a very helpfull credit for all the buildings that does not have a cooling tower in their HVAC systems.

Although water cooled chillers may be sometimes more...

Documentation for No Cooling Tower

Pilot-Credits WEpc94: No Cooling Tower
posted by Marelle Davey on Feb 2, 2022, 6:37 pm

In addition to the Credit Specific documentation, you will need to provide proof that you participated in the LEEDuser forum, and completed the USGBC feedback survey. Log in or register to post comments...

Last reply: Konstantina Kalliakoudi, Mar 14, 2023, 4:20 am

Pilot-Credits WEpc94

Pilot-Credits WEpc94: No Cooling Tower
posted by Nermin Hegazy on Sep 21, 2022, 7:52 am

I have a question regarding one of the conditions to be met to achieve this credit:

  • the baseline system designated for the building using ASHRAE 90.1-2010 Appendix G Table G3...

Last reply: Yuexin Ge, Nov 30, 2022, 9:50 am

No Cooling Tower Sweden

Pilot-Credits WEpc94: No Cooling Tower
posted by Louise Holmstedt on Nov 10, 2022, 6:55 am

We are pursuing this pilot credit as ACP for a Swedish Project. We Think it is fair that Projects without cooling Towers can achieve the no cooling Tower credit too.

Cooling Towers to meet the loads of uninterrupted office systems

Pilot-Credits WEpc94: No Cooling Tower
posted by Adriana Hansen on Nov 4, 2022, 7:53 pm

Could projects with HVAC system base conception composed by direct expansion air cooled VRF system for all spaces, but including a condensing water plant to provide a condensate water point to...

ACP for No Cooling Tower

Pilot-Credits WEpc94: No Cooling Tower
posted by Natalie Terrill on Dec 31, 2021, 1:00 pm

This is a straight forward, easy to document credit for projects that can demonstrate compliance. We've pursued this on a few projects now and I' happy to see there is a way for projects to earn...

Last reply: Ca2 Consultoria, Aug 18, 2022, 1:50 pm

Evaporative Cooling Fan is not available to meet No Cooling Tower option?

Pilot-Credits WEpc94: No Cooling Tower
posted by Esteban Martinez on Aug 10, 2022, 10:28 am

We are working on a project without Cooling Tower, also the HVAC system has an Evaporative Cooling Fan.

Does this make that the project can not pursue this credit? 

Regards,