Documentation for No Cooling Tower

Pilot-Credits WEpc94: No Cooling Tower
posted by Marelle Davey on Feb 2, 2022, 6:37 pm

In addition to the Credit Specific documentation, you will need to provide proof that you participated in the LEEDuser forum, and completed the USGBC feedback survey. Log in or register to post comments...

Last reply: Konstantina Kalliakoudi, Mar 14, 2023, 4:20 am

Pilot-Credits WEpc94

Pilot-Credits WEpc94: No Cooling Tower
posted by Nermin Hegazy on Sep 21, 2022, 7:52 am

I have a question regarding one of the conditions to be met to achieve this credit:

  • the baseline system designated for the building using ASHRAE 90.1-2010 Appendix G Table G3...

Last reply: Yuexin Ge, Nov 30, 2022, 9:50 am

No Cooling Tower Sweden

Pilot-Credits WEpc94: No Cooling Tower
posted by Louise Holmstedt on Nov 10, 2022, 6:55 am

We are pursuing this pilot credit as ACP for a Swedish Project. We Think it is fair that Projects without cooling Towers can achieve the no cooling Tower credit too.

Cooling Towers to meet the loads of uninterrupted office systems

Pilot-Credits WEpc94: No Cooling Tower
posted by Adriana Hansen on Nov 4, 2022, 7:53 pm

Could projects with HVAC system base conception composed by direct expansion air cooled VRF system for all spaces, but including a condensing water plant to provide a condensate water point to...

ACP for No Cooling Tower

Pilot-Credits WEpc94: No Cooling Tower
posted by Natalie Terrill on Dec 31, 2021, 1:00 pm

This is a straight forward, easy to document credit for projects that can demonstrate compliance. We've pursued this on a few projects now and I' happy to see there is a way for projects to earn...

Last reply: Ca2 Consultoria, Aug 18, 2022, 1:50 pm

Evaporative Cooling Fan is not available to meet No Cooling Tower option?

Pilot-Credits WEpc94: No Cooling Tower
posted by Esteban Martinez on Aug 10, 2022, 10:28 am

We are working on a project without Cooling Tower, also the HVAC system has an Evaporative Cooling Fan.

Does this make that the project can not pursue this credit? 

Regards, 

WEpc94 No Cooling Tower

Pilot-Credits WEpc94: No Cooling Tower
posted by Dave Hubka on Sep 20, 2021, 2:48 pm

a cooling tower or other system that uses the latent heat of the evaporative cooling of water, and is not connected to a District cooling system I will update the forum with any lessons after the review Log...

Last reply: Triple Green Building Group, Apr 28, 2022, 9:55 am

Pilot-Credits WEpc94- No Cooling Tower

Pilot-Credits WEpc94: No Cooling Tower
posted by Adriana Hansen on Dec 8, 2021, 6:30 pm

We would like to know if there is an estimated date of closure.

We have many projects that don´t have cooling tower but attends the requirements of the pilot and have the baseline system...

Last reply: Irene García Sáez, Dec 23, 2021, 2:45 pm

No Cooling Tower pilot credit

Pilot-Credits WEpc94: No Cooling Tower
posted by Gail Napell on Oct 30, 2018, 12:59 am

Hi all

we're pursuing this credit and received a comment from the LEED reviewer that we need to submit the survey confirmation e-mail in order to achieve the credit.  The survey asks if we...

Last reply: Stephanie Graham, Dec 8, 2021, 11:17 pm

No Cooling Tower in LEED v2009 School

Pilot-Credits WEpc94: No Cooling Tower
posted by Sandra Schmid on Aug 31, 2021, 5:44 am

We are working on a LEED v2009 school project in Germany which is equipped with VRV refrigerating outdoor units for cooling of some rooms so there is no cooling tower, no use of latent heat of...