Occupancy rates Appendix 2 Daily averages or peak occupancy
NC-v4.1 WEp2:Indoor Water Use Reductionposted by Julio Fernandez Amodia on
Hi there,
I am currently calculating the peak occupancy and daily average occupancy for a mall building.
Data Sheet or Laboratory test report?
NC-v4 SSc5:Heat island reductionposted by Samer Alhmdan on
Hello, Do we need a laboratory test report to substantiate the SRI, or the Data Sheet by manufacturer is sufficient ?
Rubber Playground Surfacing and Decomposed Granite
Schools-EBOM-v4.1 SSc2:Heat Island Reductionposted by Camila Luong on
Hi! During construction our client has added a playground area and changed a small ampitheater from grass to DG.
Total Roof Area vs. Total Applicable Roof Area
CS-v4 SSc5:Heat island reductionposted by James Jin on
Hi all,
Fully opacified spandrel glazing
Pilot-Credits SSpc55:Bird collision deterrenceposted by darryl strouse on
We are spandrelizing a significant portion of our project's glazing.
Waste Hauler
NC-v4 MRc5:Construction and demolition waste managementposted by Stacey Schmidt on
I work for a waste hauler and am trying to figure out if there is any certification that we need in order to help LEED builders.
Detailed requirements for Option 1, Path (2)b-2: Life-Skills Training for Social equity within the PROJECT TEAM
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Amie Blankenship on
Regarding 'Social equity within the project team' (NOT WITHIN O+M STAFF) Option 1, Path (2)b-2: Participation in, or providing of, access to workforce development training through Life-Skills train
Can start of 365 data collection period be retroactive?
EBOM-v4.1 EAp3:Energy Performanceposted by Susan Di Giulio on
Hi,