Log in
Forum » NC-v2.2 EQp2
Loading...
Topic

a LEED-NC V2.2 three-story mixed use building

NC-v2.2 EQp2: Environmental Tobacco Smoke (ETS) Control
posted by James L Newman on Feb 11, 2014, 11:32 pm

Building is non-smoking with a restaurant on the 1st floor, commercial office space on the 2nd, and 11 residential apartments on the 3rd.
The corridors on all three floors are pressurized...

Last reply: Michelle Rosenberger, Feb 12, 2014, 12:01 pm

No smoking policy on property

NC-v2.2 EQp2: Environmental Tobacco Smoke (ETS) Control
posted by Verde Design on Jun 25, 2013, 6:42 pm

I am working on a Children's Museum. The museum does not want Smoking anywhere on the property, inside or outside. We are putting signs at all door entries stating "No smoking on property". Do we...

Last reply: Tristan Roberts, Nov 4, 2013, 4:22 pm

Blower Door Testing- Multi Unit Residential Building

NC-v2.2 EQp2: Environmental Tobacco Smoke (ETS) Control
posted by Erin Norton on Apr 26, 2013, 4:20 pm

Does the blower door testing for a MURB have to be completed prior to occupancy, or can this be done afterwards? Thanks in advance for any information you can share.

Last reply: Erika Duran, Jul 29, 2013, 4:17 pm

Smoking during construction

NC-v2.2 EQp2: Environmental Tobacco Smoke (ETS) Control
posted by Carrie Gordon on Mar 29, 2013, 10:40 am

If construction workers were allowed to smoke in the building during construction, but only prior to interior finishes being installed, are they allowed to attempt LEED or does this disqualify...

Last reply: Ben Stanley, Apr 1, 2013, 3:03 pm

Sampling Procedure Clarification Needed

NC-v2.2 EQp2: Environmental Tobacco Smoke (ETS) Control
posted by John Hollingsworth on Oct 22, 2010, 6:13 pm

Hello Good People,

I am trying to clarify the sampling procedure for EQp2 for a LEED-NC mixed use (downstairs retail/upstairs residential) project. The project contains almost 100...

Last reply: Jennifer Preston, Oct 16, 2012, 4:03 pm

weatherstripping details

NC-v2.2 EQp2: Environmental Tobacco Smoke (ETS) Control
posted by Jonathan Braman on May 11, 2012, 2:42 pm

Hello,

For a multifamily residential project, has LEED provided any detailed guidance on weather-stripping doors to hallways (e.g. the type of product that could be used, do all 4 sides of...

Last reply: Tristan Roberts, Aug 31, 2012, 11:30 am

Non-Smoking Residential Lease Language

NC-v2.2 EQp2: Environmental Tobacco Smoke (ETS) Control
posted by Michelle Rosenberger on Feb 13, 2012, 1:43 pm

We got a clarification request on our EQpr2 Environmental Tobacco Smoke documentation denying our no smoking lease language and referring to 5 bullet points that must be included in a residential...

Last reply: Megan Ritchie Saffitz, Feb 27, 2012, 1:51 pm

No Smoking 25' from building entrances

NC-v2.2 EQp2: Environmental Tobacco Smoke (ETS) Control
posted by Maria Sarrido on May 9, 2011, 1:02 pm

Our project is a retail one-story building , and will have the policy of smoke free businees. Also, we will follow the 'no smoking withing 25' of building entries and air takes'.
Do we need...

Last reply: Tristan Roberts, Nov 12, 2011, 11:29 pm

EQ p2 no smoking

NC-v2.2 EQp2: Environmental Tobacco Smoke (ETS) Control
posted by Gita Nandan on Jan 13, 2011, 4:23 pm

If our residential building follows the path of no smoking throughout the building and public areas - what documentation is required to prove that it is complying. Signage? would we need to show...

Last reply: Tristan Roberts, Oct 31, 2011, 4:39 pm

Casinos

NC-v2.2 EQp2: Environmental Tobacco Smoke (ETS) Control
posted by Bill Swanson on Apr 20, 2011, 1:18 pm

I was sorting thru lists of LEED projects and saw the Palazzo in Vegas (8,304,437 sf) earned LEED Silver a couple years ago. They publicly announce that 50% of the gaming space allows smoking....

Last reply: Michael Miller, Apr 27, 2011, 2:32 pm