Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Residential, Commercial vs Institutional

LEED Rating System Selection
posted by  Phillip Cook  on 

I am working on a building used to house sick children and their family after their treatment. It is not a healthcare building (i.e. no medical staff).

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Mon Sep 16, 2013, 3:26 am

Process Energy Savings, Alternative Compliance Path

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

Dear forum, We are working with an industrial plant that is seeking to obtain the LEED Certification.

3
Fri Sep 13, 2013, 4:24 pm

Counting existing trees on site towards open space

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Mike Stopka  on 

I am trying to meet the 30% open space target. The project has plenty of open pedestrian-oriented hardscape area.

3
Default Avatar
Architect
Optimized Design Solutions
LEEDuser Basic Member
4 thumbs up
Fri Sep 13, 2013, 2:03 pm

Two Multi-Occupant Spaces with incomplete wall separation

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Annalise Reichert  on 

I am working on an educational facility and all multi-occupant spaces contain thermostat controls except for one classroom.

4
Thu Sep 12, 2013, 10:39 pm

Vending Machine Rated Power

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Lara Schneider  on 

Does anyone know what the rated power is for vending machines?

3
Thu Sep 12, 2013, 10:30 am

A/V Equipment

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Jennifer Preston  on 

We are compiling the equipment for a multi-floor office renovation. Dow e need to include A/V Equipment? Including ceiling speakers, projectors, projection screens, microphones, etc?

2
Thu Sep 12, 2013, 10:21 am

SSc1: Previously Certified Projects

General forums
posted by  Peter Locke  on 

It seems that the only way a previously certified LEED EB project can obtain these 4 points is if the project has "maintained tracking" since completeing the initial certification (see guidance on

2
Owner
Silliker + Partners
LEEDuser Basic Member
46 thumbs up
Wed Sep 11, 2013, 9:51 pm

Threat factor calculation for operable shutters

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Jessica Wuest  on 

Hi, I was wondering how to calculate operable shutters that cover clear glass.

2
Sites Technical Specialist, LEED
USGBC
LEEDuser Premium Member
47 thumbs up
Wed Sep 11, 2013, 9:04 pm
2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Wed Sep 11, 2013, 7:26 pm

Floor Leveling Product

Healthcare-v2009 IEQc4:Low-emitting materials
posted by  Catherine Blakemore  on 

Does a floor leveling product get listed as a floor coating?

4
Wed Sep 11, 2013, 5:47 pm