Forum quick links
building depth and daylighting.
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Denise Santini on
Hi all, We have a project where the floor plate is 120'x120' with 12' high windows on 3 sides of floor plate.
applying the 25% default recycled content value for steel
NC-2009 MRc4:Recycled Contentposted by Steve Loppnow on
Can the 25% default recycled content value for steel be applied to door hardware and non-structural steel framing, or can it only be applied to structural steel?
Blowout Fixtures
CS-2009 WEp1:Water Use Reductionposted by Luis Miguel Diazgranados on
Hello Everyone: The project we are working on is an office building applying for LEED CS. The project will have two "public" restrooms in each floor (men/women).
Back up documentation
Schools-2009 MRc4:Recycled Contentposted by Nell Achtmeyer on
When this credit is audited and the total back-up documentation is requested, what does LEED require aside from the cut-sheets/MSDS/letter from manufacturer that specifically identifies the % and t
Data Release Form
posted by Dana Murdoch on
I cannot find the Data Release Form! HELP! Where is it??
SSc1 Option L
CI-2009 SSc1:Site Selectionposted by Wini Leung on
Has anyone submitted an Option L credit that is in reference to LEED-EBOM?
denied credits in Preliminary Design Review
posted by Daniela Castro Salgado on
Two questions: 1.
Millwork, and French translation
NC-2009 MRc7:Certified Woodposted by Maura Adams on
How does one account for FSC materials in millwork? The vendor has a list of dozens of millwork components.