Life and Light Output

EBOM-2009 MRc4:Sustainable purchasing - reduced mercury in lamps
posted by  Simon Sue  on 

This credit requires not only the mercury content of the bulbs, but specific life and light output using specified testing methods: · Life of bulb: 3 hours on/20 minutes off for fluorescent bulbs;

4
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Fri May 9, 2014, 4:01 am

Still Confused?!?

NC-2009 SSc1:Site selection
posted by  JoAnn Jolin  on 

While I've been a LEED AP for several years, this is my first time being the person inputting data into the online forms.

5
Building Enclosure Consultant
BPL Enclosure
LEEDuser Basic Member
58 thumbs up
Fri May 9, 2014, 2:10 am

Additions in the interior of the existing building

NC-2009 PIf2:Project Summary Details
posted by  VICTOR MORENO  on 

Hello, In the project that I manage is summarized in a rehabilitation of an existing building in which rehabilitates all floors.

2
Thu May 8, 2014, 5:13 pm

EAC2 Form Definitions

NC-2009 EAc2:On-site renewable energy
posted by  Robert Wichert  on 

The EAC2 Form asks for "Annual Renewable Energy Cost". I believe this is the SAVINGS from the renewable energy.

4
Thu May 8, 2014, 3:00 pm

Question about MEP components

CS-2009 MRc4:Recycled content
posted by  Morteza Kasmaei  on 

Are registers, fixed bar return air grilles, and diffusers considered as MEP components and cannot be included in the MR calculation?

2
Default Avatar
LEEDuser Expert
472 thumbs up
Wed May 7, 2014, 11:25 pm

district heat pumps

NC-2009 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

Two buildings (“building A” and “building B”) are on adjacent sites. The project team wants to achieve two different LEED NC certifications.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed May 7, 2014, 9:57 pm

FSC WOOD

NC-2009 MRc7:Certified wood
posted by  jack larson  on 

Three questions 1) The LEED reference guide states that both FSC pure and FSC mixed credit can both be claimed as FSC 100 %. It does not specify the type of system that ought to be used.

4
Environmental Stewardship Manager
Tarkett North America
LEEDuser Basic Member
64 thumbs up
Wed May 7, 2014, 4:38 pm

Design Process Load requirements?

CS-2009 EAp2:Minimum energy performance
posted by  Matt Humphreys  on 

If a mechanical design engineer adds a note on the mechanical schedules stating "AHU capacities shown are based upon 4Watts/S.F.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed May 7, 2014, 4:16 pm

Time period

Pilot-Credits SSpc16:Rainwater management
posted by  Anna Korinkova  on 

Our building will implement a stormwater harvesting system.

3
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Wed May 7, 2014, 2:59 pm

Water quality examples

NC-2009 WEc2:Innovative wastewater technologies
posted by  Mitch Gascoyne  on 

Does anyone have a good resource for expected water quality/colour of collected rainwater for toilet flushing?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Wed May 7, 2014, 2:47 pm