Forum quick links
Kitchen exhaust fans
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Harry Flamm on
Is an Existing Building (residential dormitory), that has recirculating kitchen exhaust fans in the student's bedroom suites and in the resident assistant's apartment, able to comply
Baseline Case System type - Group Building
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All:-
Are bathtubs included
Homes-v4 EAc2:Efficient hot water distribution systemposted by Emmanuel Pauwels on
I wonder if this also applies to a bathtub. I would think it wouldn´t since you fill the bathtub with a mixture of hot and cold water so the cold water would not be wasted.
Surrounding Density - existing or approved buildings?
CS-v4 LTc4:Surrounding density and diverse usesposted by Sareet Benayahu on
My project is a high rise office building planned in an area that was previously industrial zone.
Shower location
NC-v4 LTc6:Bicycle facilitiesposted by Thu Nguyen on
This credit requires that "Provide at least one on-site shower with changing facility for the first 100 regular building occupants and one additional shower for every 150 regular building occupants
Living Future 2018 and Portland LF18 Ramp-Up Events
posted by Amanda Ingmire on
Want to make sure those in Portland are aware of a couple of LF18 Ramp-Up Events happening on April 10th.
performance RFP
posted by Kate Bubriski on
Does anyone have language from an RFP that had specific performance criteria included that they could share? Such as a specific EUI target, detailed language about net zero, passive house
Multifamily Setpoints and Equipment Load
NC-v4 EAp2:Minimum energy performanceposted by Cory Duggin on
Are we required to use the equipment loads and setpoints from the Energy Star Multifamily High Rise Simulation Guidelines? I found that it is referenced by LEED for Homes, but I haven't found
How the fan efficiency W/cfm and pump efficiency W/gpm is decided in Ashrae 90.1?
CS-v4 EAp2:Minimum energy performanceposted by Homer Wang on
Where or which book we can find about how the fan efficiency W/cfm and pump efficiency W/gpm is decided in Ashrae 90.1 just like what type building or how large build is considered and how long duc
default visitor count for retail projects
Retail-NC-v4 LTc6:Bicycle facilitiesposted by Gail Napell on
we're doing a C+S with a retail lease space. How do we determine the retail visitor count for this credit, WE, etc.? i thought i saw this in v2009 but now i can't find it - can someone