Forum quick links
Bus stops facing each other on opposite sides high way.
NC-v4 LTc5:Access to quality transitposted by Bekir Çetin on
Dear All,
General Emissions Evaluation for installation products
Schools-EBOM-v4 EQc1:Indoor air quality management programposted by Sara Axon on
For installation of millwork, our installer uses basic items: liquid nail, wood glue, silicone, spackle, etc.
Averaging Thermostats - acceptable means for 50%?
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Mark Van on
I am working on a Healthcare building, and most of the spaces combine (3) rooms into a single temperature control zone, with the thermostat located in one of the rooms. Would adding (at least
Insulation Emissions: California “Practice for Testing of VOCs from Building Materials Using Small Chambers”
Homes-v2008 MRc2:Environmentally preferable productsposted by Joanne Sawatzky on
Hi,
Sefaira Software for Daylight calculation - sDA and ASE
CS-v4 EQc4:Daylightposted by Nuttanee Vongveeranonchai on
Dear All,
I found that Sefaira has calculated sDA and ASE which are required for LEED v4 Daylight compliance. Can I use this result for the submission?
Rainwater Events Calculator v4
NC-v4 SSc4:Rainwater managementposted by Carmen Mielecke on
Dear all, my 2 question refer to the rainfall events calculator. 1) the percentil is calculated on the historical data sheet. The amount is expressed in mm.
Enhanced Commissioning
CI-v4 EAc1:Enhanced commissioningposted by Lance Barron on
Is building envelope commissioning required for CI if the exterior walls and roof are not being touched? Thanks.
Locker Rooms as Changing facilities
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Ryan Christensen on
As I fill out the SSc4.2 credit form, I am having trouble reconciling my project into the changing facility vs. shower categories. The project has two large locker rooms with 100+ lockers.