Compliance for a line of paints
NC-v4 EQc2:Low emitting materialsposted by Charline SEYTIER on
Hello,
We have a question regarding the validation of LEED VOC requirements for a group of specific colored paints belonging to a line of paint from one manufacturer.
German AgBB in LEED version 3 and 4
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Jens Apel on
In a LEED v3 project a manufacturer is supplying information that his carpet is complying with AgBB 2015. For LEED v4 this would be sufficient (as far as I know newer standards are accepted).
Actual flowrate per PSI vs labeled flow rate.
NC-v4 WEc2:Indoor water use reductionposted by Kristen Magnuson on
Fixtures are labeled as a certain GPM--1.5, for example. However, depending on the PSI, which the plumbing engineer can provide, the actual flow rate may differ.
Small addition to existing building
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Edmée Knight on
Our project is a small addition (<10% of total building GSF) to an existing building.
Recycled non-potable water measurement
NC-v4 WEc3:Cooling tower water useposted by Elizabeth (Zeba) Floyd on
Our intention is to reuse stormwater and condensate for at least 20% of the make-up water for the Cooling Tower.
LEED V4 - Retail Vs Core&Shell
posted by Ricardo Sá on
Dear All,
could I use the LEED Core&Shell despite LEED Retail, for a supermarket if the fit-out will not be owner responsibillity.
Thanks in advance,
Car and motorcycle parkings
CS-v4 LTc7:Reduced parking footprintposted by Emmanuel Pauwels on
For this credit, are motorcycle parkings spaces also included or only car parking?
Energy modeling- DOAS units with reactivation air
NC-2009 EAc1:Optimize Energy Performanceposted by Matt Hollenbeck on
I have an HVAC system that will use a DOAS unit to supply neutral temperature air in a humid climate (climate zone 2). The proposed DOAS unit utilizes a dessicant wheel with reactivation
Fundamental Commissioning Timeline
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Todd Bundren on
I am working on a project where the Owner Project Requirements and Basis of Design were created at the appropriate times.