Roof Top Patio
NC-v4 SSc5:Heat island reductionposted by Irene Chung on
Hello, 1/4 of my project's roof area is going to be patio that is accessible to occupants. Can rooftop patio be excluded?
Track Energy Consumption data
EBOM-v4 EAp3:Building-level energy meteringposted by Ana Paula Quiros on
According to the guide:
Track energy use monthly, beginning at least 12 months before the final day of the building’s initial LEED
O+M performance period.
What is a CB and why can't I submit my project?
posted by Brightworks Sustainability on
I went to submit my project today and received an error message stating "Your project has not been assigned a CB.
ETS Blower Door Test- Suite Preparation
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Mohammad Fakoor on
Hello Everyone,
Retrofit of a existing building into green building
EBOM-2009 WEc1:Water Performance Measurementposted by Mohammed Ibrahim on
Storm water from neighboring site
NC-v4 SSc4:Rainwater managementposted by Bradley Magnusson on
The project I am working on is in a campus setting and the neighboring site's excess runoff is discharged into a storm drain pipe that runs through our project's
NC-v4 SSc2 - Site development - protect or restore habitat
NC-v4 SSc2:Site development - protect or restore habitatposted by Mar Mulero on
Hello :an outside area of land with vegetation, but where lighting has been installed and dirt roads have been formed, long time ago, it can be considered a greenfield area or previously disturbed?
Production plant - LEED system selection
posted by Agnieszka Rylska on
What is the most appropriate LEED system for a new production plant? Can we register the project under LEED for Warehouses and Distribution Centers?
Threat Factor Calculation
Pilot-Credits SSpc55:Bird collision deterrenceposted by Francesco Passerini on
Hi I've been working on a project where I want to purse this pilot credit.