Forum quick links
LEED ND v4 MPR2 project area
ND-v4 MPR2:Must use reasonable LEED boundariesposted by wenting ding on
Hi,
Garden and Recreation space
NC-v4 SSc3:Open spaceposted by Jonelle Humphrey on
If I were designing a two-way running path, with each direction of travel to be separated by a (narrow) raised garden bed along the edge of my site, would this area count towards "garden space
LEED ND v4 MPR2 project area
ND-v4 MPR2:Must use reasonable LEED boundariesposted by wenting ding on
We are considering applying for a LEED ND cergification.
Automatic Receptacle Control
CI-v4 EAp2:Minimum energy performanceposted by Erik Camacho on
EAp2 has an mandatory ASHRAE requirement (90.1-2010, Section 8.4.2 Automatic Receptacle Control) requiring at least half of all private offices, open offices, and computer classrooms to be controll
Additional requirements - Guarantees of Origin (GOs)
NC-2009 EAc6:Green powerposted by Jens Apel on
The European ACP for EAc6 states: "Guarantees of Origin (GOs) are an acceptable equivalent to the Green-e program for electricity if additional requirements are met with regards to location of powe
Site domain name
posted by Andrea Lemon on
Everyone agreed during last Friday's meeting that we want to call the site BITuser. The question, however, is what domain name should be used.
Wood Tables made for a retail Project
Retail-CI-v4 EQc2:Low emitting materialsposted by Cindy Davis on
My retail project is having cafe tables made by the owners millwork company that would have metal legs and a wood top. If the wood met the requirements of the composite wood VOC (CA
Sidewalk Considered "Bike Network"?
NC-v4 LTc6:Bicycle facilitiesposted by Jenni Betancourt on
Hey LEEDusers - If a sidewalk is min. 5' wide, will GBCI consider that a one-way bicycle network? The project is in a suburb of Chicago. Thanks in advance for comments!