Forum quick links
Historic building adapted as Hotel - how is baseline treated?
Hospitality-NC-v4 EAp2:Minimum energy performanceposted by Sherman Aronson on
Adapting an historic building as a hotel use with all new HVAC, power, water and all systems but no thermal improvements to the exterior envelope.
Indoor Air Quality Testing
posted by Brian Parker on
To Whom It Concerns,
Exterior Luminaire Schedule Format
Pilot-Credits SSpc55:Bird collision deterrenceposted by Alfredo Davalos on
Hi All,
Under what conditions would LEED regulate wet-applied low voc finishes inside underground parking garages?
NC-v4 EQc2:Low emitting materialsposted by Annie Levan on
Under what conditions would LEED regulate wet-applied low voc finishes inside underground parking garages?
Acoustic Consultant
NC-v4 EQc9:Acoustic performanceposted by Cora Kenrick on
I just want to clarify that it is not a requirement to have an acoustic consultant for this credit?
Thanks for the help.
Sam Cx agent for Enhanced & Envelope commissioning
NC-v4 EAc1:Enhanced commissioningposted by Cora Kenrick on
Can the same Cx complete both option 1 and option 2 for the Enhanced Commissioning?
expiration of floorscore certification or CRI GLP during construction
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Debra a. Lombard on
expiration of floorscore certification or CRI GLP during construction:
at time of submittal review/approval floor product had current certification.
Test Method WPSTM C1454 for sealant
NC-v4 EQc2:Low emitting materialsposted by Marina Dimitriadis on
We have a project that wants to use GE SCS1000 Silicone, but the test method for this product is WPSTM C1454 (V: 20 g/L). Would this product still meet the General Emissions and VOC limits?
Lighting controls requirements
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Marina Curto on
Hi everyone,
I'm working on a School project in v2009 and I have some doubts whether the lighting controls design would meet credit requirements. I have two different cases: