Forum quick links
EVSE and ADA parking spaces
NC-v4.1 LTc8:Electric Vehiclesposted by Bryna Dunn on
Has anyone submitted a project that includes ADA spaces in the spaces served by EVSE? For example, if a total of 3 charging stations are required on a project, and one of those is placed at a
Approved Documentation for the California Department of Public Health General Emissions Evaluation
NC-v4.1 EQc2:Low-Emitting Materialsposted by Summer Gorder on
We are having trouble getting proper documentation from Manufacturers for this additional requirement.
Multizone or Single Zone 62.1 Calculation?
NC-v4.1 EQp1:Minimum Indoor Air Quality Performanceposted by Jon Silhol on
We are designing a TV studio that has two ventilation zones; 1) Stages, studios and 2) Auditorium for seating areas within the TV studio. There is a dedicated single zone, recirculation AHU s
No Cooling Tower Sweden
Pilot-Credits WEpc94:No Cooling Towerposted by Louise Holmstedt on
We are pursuing this pilot credit as ACP for a Swedish Project. We Think it is fair that Projects without cooling Towers can achieve the no cooling Tower credit too.
On site or Off site seperation
CS-v4 MRc5:Construction and demolition waste managementposted by Andrea Tirao on
Our project has extensive generation of wastes into different activity zones.
CARE Tool: Carbon Avoided Retrofit Estimator
posted by Larry Strain on
Greetings from the CARE Tool Team,
Buildable Land
NC-v4 LTc4:Surrounding density and diverse usesposted by Deborah Stadler on
Does a Regional Detention Pond for a planned development count as 'buildable land' per LEED? We think since it has been set aside for water retention, is should not be included in the 'builda
Change in pilot credit requirements
Pilot-Credits WEpc147:All-Gender Restroomsposted by Megan Leslie on
One thing our team noticed was that the pilot credit requirements have changed over time. Originally the requirement said "Facilities SHOULD provide means for the distribution of menstruation