Signage Requirements

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) control
posted by  Ryan Tinus  on 

Hello. We have a building located downtown in Chicago, and have a question regarding required verbiage for the signage posted at building entrances.

1
Thu Apr 10, 2014, 5:44 pm

Clarification on the San Francisco list

EBOM-2009 IEQc3.6:Green cleaning - indoor integrated pest management
posted by  Mark Palmer  on 

Ever since the misprint in the original LEED 2009 EBOM Reference Manual, we here in San Francisco have had to answer a lot of questions from confused LEED APs re: our pesticide lists.

1
Fri Apr 11, 2014, 3:22 am

Pest Prevention by Design guidelines

EBOM-2009 IEQc3.6:Green cleaning - indoor integrated pest management
posted by  Mark Palmer  on 

While it is not yet part of the LEED guidelines, you may find our new "Pest Prevention By Design" guidelines useful.

1
Tue Sep 4, 2018, 6:53 pm

IEQc6 vs IEQp1

NC-2009 IEQc6.2:Controllability of systems - thermal comfort
posted by  ANDRZEJ ROMANOWSKI  on 

Hi, I work on a CS project ventilated by AHUs and approach both IEQp1/IEQc2 and IEQc6. For getting the IEc6 points both room controllers and operable windows are used.

1
Fri Apr 11, 2014, 9:18 pm

Rainwater re-use

EBOM-2009 SSc6:Stormwater quantity control
posted by  ethan adams  on 

We plan to use storage tanks for rainwater collection, then re-use the water in our cooling tower and possibly toilets.

1
Wed Apr 16, 2014, 11:51 am

Just Want to Know

NC-2009 SSc7.2:Heat island effect - roof
posted by  PAWAN DAHIWAL  on 

It may be a silly question. If both both low sloped and steep sloped roof material is same, why steep sloped roof requires lower SRI paint?

1
Mon Apr 14, 2014, 3:04 pm

IO Credit _ Option B (Additional Strategies)

EBOM-2009 RPc1:Regional priority
posted by  Pal Ahuja  on 

For our first LEED Canada EB & M Rating System project, We are working to achieve innovation in operations credits by using Option B(1-4 Points) that allows to propose your own strategy (one no

1
Thu Mar 10, 2016, 4:15 am

USGBC Credit Library Access

General forums
posted by  Marilou Denum  on 

Hello All, I am preparing for the LEED AP BD+C exam and I tried to access the Credit Library on the USGBC website and for some reason when I get inside the credit library - Commercial Interiors-Re

1
Fri Apr 18, 2014, 2:18 pm

Suspended Ceiling

NC-2009 EAp2:Minimum energy performance
posted by  Omar Elrawy  on 

Dear all, I have a suspended ceiling with a 60 cm air gap between the panels and the reinforced concrete slab where all the electro-mechanical lies, but it doesn't act as plenum zone si

1
Mon Apr 14, 2014, 6:17 pm

Smoking zone - away from pedestrian traffic

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) control
posted by  Devani PERERA  on 

Hello, We have recently received a remark from a review that our designated smoking zone is not compliant since it is not 25 feet away from concentrations of building occupants and pedestrian traff

1
Fri May 23, 2014, 4:16 am