Hi, I work on a CS project ventilated by AHUs and approach both IEQp1/IEQc2 and IEQc6. For getting the IEc6 points both room controllers and operable windows are used. I was given a comment from the USGBC saying I should indicate in the IEQc6 form also "project building is naturally ventilated". This is linked to IEQp1 and IEQc2 form which means an additional table IEQp1-A5 must be fulfilled. The buiding is ventilated mechanically by AHUs and these operable windows can be used only to improve comfort controlability in lieu of room controllers. Therefore presenting calculations confirming proper operation of natural ventilationin the IEQp1-A5 is pointless. I haven't met in the Reference Guide suggestions to rearrange the ventilation priciple in the case of using operable windows for IEQc6. Thank you in advance Andrzej