Modeling baseline DES under Option 1, Path 2 - full DES performance accounting
CS-v4 EAc2:Optimize energy performanceposted by Lenka Matějíčková on
Hi All,
We are modeling an industrial plant including the plant DES system, pursuing the Option 1, Path 2. Full DES Performance Accounting.
PV panels on Roof
CS-v4 SSc5:Heat island reductionposted by Andrea Tirao on
Hi, Our project has parking on basement, GF+1F office spaces, then roof is covered almost entirely of PV panels.
50% Unbound
Healthcare-v4 SSc5:Heat island reductionposted by Lene Hill on
What does unbound mean? How is unbound determined?
WE Indoor water use reduction - Detention facility requirements
NC-v4 WEp2:Indoor water use reductionposted by Lawrence Rennell on
We are currently working on 2 small detention facilities (25 beds and 60 beds). Both projects are new construction and are not Retail, school, or hospitality projects.
SR for White Cement Concrete Pavement
NC-v4 SSc5:Heat island reductionposted by Osman Faroq on
Dear LEED Users,
Designing Baseline with Natural Ventilation using IDA-ICE
NC-v4 EAp2:Minimum energy performanceposted by Azra on
Hi,
LEED Ceremonies at Opening Day
NC-v4.1 EAc1:Enhanced Commissioningposted by Kath Williams on
Is there any way under version 4.1to meet the requirements of this credit in a timely fashion so that the LEED Plaque can be awarded on the building's opening/ribbon cutting day? Enhance
How to account for pressure adjustments when Multiple units have different MERV filters
NC-v4 EAc2:Optimize energy performanceposted by Rajat Wadhwa on
Hi , I am working on a model in which the baseline is system 7 which means 1 system per floor, but the proposed system has different units serving one floor and they have different MERV filter rang
Reclaimed land
NC-v4 LTc2:Sensitive land protectionposted by Nermin Hegazy on