Forum quick links
Off-site Renewable/Solar Energy
CI-v4 EAp2:Minimum energy performanceposted by Rahil Shah on
Hello,
Introducing open-office plan..!!
posted by James Carvlin on
Hey,
Our company is planning for an open-plan office to encourage collaboration and to promote transparency. But we have found few drawbacks to this open-plan office because,
Renewable energy production DES Path 1
NC-v4 EAc5:Renewable energy productionposted by Lisa Loreti on
We are modeling a building connected to a DES and we decided to follow Option1 - Path1 for energy modelling.
How to cal kw/cfm
EBOM-v4.1 EAp3:Energy Performanceposted by Oatto Promsrisawat on
good morning every body as
1. I have input motor on specification 442 Watts (it include power factor or not)
2. I have cfm 1333 cfm
Single occcupant rooms for brief and silent work - thermal controls required?
CI-v4 EAc2:Optimize energy performanceposted by Andrzej Gutowski on
Dear collegues,
HVAC Load Calculation Software
posted by Sarah Gudeman on
Wondering if we can have a dialog on HVAC load calculation software...
Pilot credit Vs LEED V4
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Javier Garcia Jones on
We are working in project that it's using pilot credit. We would like to know if there are any learned lessons for V4 credit. Do you have any experience with this issue?. Thanks in advantage
Shared Multi-Occupant Spaces within Open Office Layout
NC-v4 EQc6:Interior lightingposted by Sarah Gudeman on
We have a current project with open office layout (individual regularly-occupied spaces) that also includes what I would call huddle areas (shared multi-occupant spaces) distributed around between