Dear all,
On a major renovation where the wall R-value/U-value needs to be brought up to energy code, specifically a mass wall situation, does anyone have insights on how the situation is best dealt with? On the project in question for me, the continuous insulation might have to be added to the inside surface of the mass wall and there are some interior partitions that will interrupt the continuity. So, it looks like the assembly U-value is the route to take, with an effective U-value calculation showing that the prescriptive assembly U-value has been met or exceeded after the interruptions are taken into account. Thanks.
Ramana Koti
Lord Aeck Sargent, A Katerra Company.