Forum quick links
Baseline HVAC Modelling - System 8, Electric Resistance Heating, and Heat Recovery (ASHRAE 90.1‑2010 Appendix G)
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hi All,
We are modelling a commercial tower under ASHRAE 90.1‑2010 Appendix G. The proposed design includes:
Regd. Primary Secondary Pump Arrangement in PRM Baseline System 8 Modelling
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello All,
Feedback after pursuing PC132
Pilot-Credits MRpc132:Procurement of Low Carbon Construction Materialsposted by Dirk Kestner on
We are completing our pursuit of this Pilot Credit. Overall it went well. Here are a few comments and observations:
LEED BD+C v4.1 Transit
posted by Deepika Parmar on
We are currently working on a metro project comprising 13 stations (a mix of at-grade, elevated, and underground typologies) and 1 depot, spread across multiple locations within the city.
Is pc98 required to earn pc99?
Pilot-Credits IPpc99:Design for Enhanced Resilienceposted by Elizabeth Powers on
Can someone clarify if a project needs to have performed the hazard assessment in pilot credit 98 and during pre-design, in order to be eligible for this pilot credit, or does this pilot credit mea
Integrative Process for Health Promotion Pilot Credit (LEED)
posted by Michelle Amt on
Hi all,
Pilot Credit Feedback
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by Jordan Millet on
This pilot credit requires participation in the LEEDuser pilot credit forum.
Integrative Analysis of Building Materials
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by on
The project team is pursuing this pilot credit after achieving BPDO EPD and HPD credits.
INc1 Bird Collision Deterrence
NC-v4.1 INc1:Innovationposted by Sean Smith on
Question regarding documenting this innovation credit, the credit requirements highlight the steps for calculating the bird collision rating (BCR), and mention we are to multiply the threat factor
Social Equity within the Project Team (Option 1)
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Atlas Turner on
Is there a reason why this pilot program for IPpc90 references social equity within the operations and maintenance staff and not social equity within the project team?