Forum » Pilot-Credits PC27
Topic

GHG Emissions in Pilot Credit EAC27

Pilot-Credits PC27: Reconcile Designed and Actual Energy Performance
posted by Arda Moltay on Nov 26, 2013, 9:02 am

Pilot Credit EApc27 requires the eventual MV evaluation report to include an evaluation of: "Avoided...

Last reply: Marcus Sheffer, Nov 26, 2013, 2:38 pm

Pilot Credit vs EAc5

Pilot-Credits PC27: Reconcile Designed and Actual Energy Performance
posted by Sara Goenner Curlee on Oct 18, 2013, 3:43 pm

I am working on a LEED NCv2.2 academic building which has completed its EAc5 Measurement and Verification effort. I am trying to understand how EAc5 and the pilot credit differ. Is it an accurate...

Last reply: Sara Goenner Curlee, Nov 1, 2013, 10:27 am

EAc7 Community Contaminant Prevention- Airborne Releases

Pilot-Credits PC27: Reconcile Designed and Actual Energy Performance
posted by Andrew Gil on Feb 8, 2013, 3:01 pm

The Online form asks "Does the project have an engine(s) that is 1,000 bhp or greater?" and includes check boxes for both "yes" and "no" responses: Is this credit more like WEc1 wherein you get...

Clarification for credit application

Pilot-Credits PC27: Reconcile Designed and Actual Energy Performance
posted by monu goyal on Jun 30, 2011, 2:11 am

hii, We are doing LEED - CI project, I am getting what should I submit at design stage, I can submit copy of contract, google survey and a draft M&V plan. Is this will meet the credit...

Last reply: Marcus Sheffer, Jul 2, 2011, 9:32 am

For those who need Verification

Pilot-Credits PC27: Reconcile Designed and Actual Energy Performance
posted by Marcus Sheffer on Dec 12, 2010, 3:21 pm

Beyond just measuring consumption. This credit explores the verification process for determining if the predicted savings during design and construction actually happened once the facility is...

Last reply: Marc Mondor, Jan 19, 2011, 5:14 pm