Forum quick links
Lotus Pro High Capacity Dispenser
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Nilda De Coutte on
Hi, Can the installation of a Lotus Pro High Capacity Dispenser contribute with points in EBOM certification?
Documentation for Existing Materials used on third party sites
NC-2009 MRc2:Construction Waste Managementposted by Martin Miille on
To make room for our new structure, we have some existing metal buildings on our site that will be dismantled and reassembled by others on someone else's property.
Lighting Controls
Retail-CI-v2009 EAc1.2:Optimize energy performance - lighting controlsposted by John Kitsalis on
I have a project that utilizes occupancy sensors as well as astronomical time-clocks. The space has a huge lobby area and so, the lights in this area were put on astronomical time-clocks.
Concrete wash-out water
CI-2009 MRc2:Construction Waste Managementposted by Christine Castellano on
The company we hired to provide concrete washout containers RECYCLES the water, can this water recycling count towards LEED credit - if yes in what category - materials and resources? Thanks
How does the new 30% structure/enclosure rule work?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jon Clifford on
In LEEDv4, Options 2 of MRc2 & MRc3 and Option 3 of MRc4 all include a rule that "Structure and enclosure materials may not constitute more than 30% of the value of compliant building products.
My thoughts on v4 ID+C
posted by Jim Park on
One of my clients is interested in v4 ID+C, so I have been reading v4 ID+C reference guide. As I am reading the reference guide, I think v4 ID+C reference guide is just poorly made. 1.
New LEED Requirements?
NC-2009 EAp2:Minimum Energy Performanceposted by Curtis Clark on
LEED Reviewers are implementing new requirements for the baseline building (LEED NC v2.2 EAp2 VAV System) through the comment process.
LEED BD+C Help
NC-2009 SSc2:Development Density and Community Connectivityposted by Farah A. on
Hi everyone, Currently racking my brains over the BD+C reference guide and can't seem to locate the answers to a few questions I have regarding BD+C rating system, if anyone can help with ANY of t
EAp2 Performance Tracking Period
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by ALIZARA JUANGBHANICH on
Hi, I have a slight question regarding the start date for tracking the EA performance period.
How does the RP credit works?
NC-2009 RPc1:Regional Priorityposted by Saud Abdul Rasheed on
Hello, I have a question which might be simple for all of you but I need to understand it well.