Topic | Recent |
---|---|
Sidestream filter?Pilot-Credits WEpc17: Cooling tower water useposted by Jonathan Weiss on Sep 7, 2012, 2:22 pm
The credit requirements do not call for a sidestream filter, but the documentation requirements list that we should confirm that a sidestream filter is being provided. Why is that? Last reply: Batya Metalitz, Sep 10, 2012, 9:21 am |
|
2009 for SchoolsPilot-Credits WEpc17: Cooling tower water useposted by Dana Murdoch on Jul 14, 2011, 2:50 pm
Can this PC17 be used for LEED 2009 for Schools?? Last reply: Tristan Roberts, Jul 14, 2011, 10:20 pm |
|
questions of Install Drift Eliminators and minimum efficienciesPilot-Credits WEpc17: Cooling tower water useposted by Jie Zhang on Apr 1, 2011, 3:09 am
In the pdf download from usgbc.org, one of the credits requirements is 'install drift eliminators that achieve minimum efficiencies of 0.2% for counter-flow systems or 0.5% for cross-flow system... Last reply: Batya Metalitz, May 25, 2011, 11:57 am |
|
How long does the monthly monitoring last for?Pilot-Credits WEpc17: Cooling tower water useposted by William Wong on Jan 26, 2011, 10:58 pm
One of the mentioned requirements is to report results of the amount of potable water used, microbiological levels, blowdown and corrosion on monthly basis, but for how long after occupancy? Last reply: Christina Macken, Feb 8, 2011, 9:24 am |