Experiences about ACP Pilot Credit – No Cooling Tower (WEpc94)?

Pilot-Credits WEpc17: Cooling tower water use
posted by Christina Nybergh on Oct 5, 2016, 7:22 am

Hi,
anyone got any experience with the Alternative Compliance Path WEpc94 – No Cooling Tower? http://www.usgbc.org/...

Last reply: David Eldridge, Jul 11, 2018, 4:38 pm

Never Have Cooling Towers

Pilot-Credits WEpc17: Cooling tower water use
posted by Janice Rogers on Jun 30, 2016, 12:39 pm

We do small renovations and have never installed or replaced a cooling tower. Do I still have a "no" credit even if I can't meet the criteria of the credit because we don't have the equipment?...

Cooling tower cycles

Pilot-Credits WEpc17: Cooling tower water use
posted by Phuc Do on Mar 11, 2015, 2:50 am

Hi all,

Our project is using Munters cooling tower in which the cooling tower cycles measured continuously and the dump cycle adjusted accordingly. Therefore, the requirement for measuring...

Basic learning...

Pilot-Credits WEpc17: Cooling tower water use
posted by Kath Williams on Sep 12, 2013, 7:42 pm

For a "non-engineer," could someone please explain what I'm hearing on the project testing this pilot credit--operator concern that cooling tower won't perform as designed and water-testing...

Last reply: Kath Williams, Oct 31, 2013, 1:18 pm

Sand Filter

Pilot-Credits WEpc17: Cooling tower water use
posted by Kenner Kingston on May 16, 2013, 11:17 am

The credit requirement #5 asks for a "diagram showing meter locations, sand filter.:
Is a sand filter required to meet the credit?

Last reply: USGBC National Office (in DC) BG+LU FW, May 16, 2013, 1:37 pm

Pipe Corrosion Rates

Pilot-Credits WEpc17: Cooling tower water use
posted by Charles Chaloeicheep on May 14, 2013, 7:25 pm

How do you determine the predicted acceptable corrosion rates for each pipe material in the condenser water system?

Providing verification that there will be side stream filtration

Pilot-Credits WEpc17: Cooling tower water use
posted by Sara Greenwood on Apr 15, 2013, 12:23 pm

Our project is pursuing an ID point for Pilot Credit 17 under the LEED-NCv2009 rating system. In reviewing the requirements, we had submitted an inquiry regarding "verification that there will be...

One-Time Potable Water Analysis

Pilot-Credits WEpc17: Cooling tower water use
posted by Edward Malesevich on Mar 13, 2013, 10:08 am

When the credit requirements ask for a "one-time" potable water analysis to be conducted, what sort of time-frame is required for this to be completed? If I'm working on an...

Last reply: USGBC National Office (in DC) BG+LU FW, Mar 13, 2013, 10:28 am

LEED HC WEc4.2 vs Pilot Credit 17

Pilot-Credits WEpc17: Cooling tower water use
posted by April Eisenhauer on Jan 31, 2013, 5:20 pm

A long-term healthcare project I have been working on that was registered under LEEDv2.2 recently got resistance for submitting LEED HC WEc4.2 as an ID credit. Our review came back requiring us...

Last reply: April Eisenhauer, Feb 4, 2013, 11:12 am

One-time potable water analysis

Pilot-Credits WEpc17: Cooling tower water use
posted by WAGNER OLIVEIRA SILVA on May 22, 2012, 9:54 am

In the new version of Pilot credit Revised at 1/3/2012 they ask to be done one-time potable water analysis. How do we do if our project already covers 100%...

Last reply: Batya Metalitz, Sep 10, 2012, 9:42 am