Historical Exemptions from Requirements

Pilot-Credits PC14: Walkable Streets
posted by Qiongwen Kong on Nov 3, 2016, 4:40 pm

Has anyone had any experience with an exemption to a requirement due to a historical building or feature?

This is regarding the requirement that no more than 30% of the primary façade can...

Last reply: Sara Goenner Curlee, Apr 3, 2018, 12:09 pm

Campus Project

Pilot-Credits PC14: Walkable Streets
posted by Sara Goenner Curlee on Mar 29, 2017, 3:31 pm

I have a campus project in Wisconsin. University projects are generally walkable and try to continue a very pedestrian orientated feel. For this project achieving the requirements came fairly...

building-height-to-street-width ratio

Pilot-Credits PC14: Walkable Streets
posted by Eric Carbonnier on Dec 14, 2016, 5:13 pm

How does the building-height-to-street-width ratio promote walkable environments?

Campus

Pilot-Credits PC14: Walkable Streets
posted by Megan Recher on Jul 14, 2016, 2:56 pm

We are applying the pilot credit in a campus setting, where the primary façade fronts a pedestrian plaza, as opposed to street.

Should we treat the plaza or pathway crosses parallel to...

Last reply: Brenda Parker, Nov 14, 2016, 2:13 pm

Multiple Street Frontages

Pilot-Credits PC14: Walkable Streets
posted by Carrie Webster on May 9, 2016, 2:46 pm

Our project is on a corner and has two street frontages, with the primary façade on the "main street" and one side along a side street. Some of the requirements specify that they apply to the...

Last reply: Agnes Vorbrodt, Nov 12, 2016, 7:15 pm

Future Alternative Compliance Paths

Pilot-Credits PC14: Walkable Streets
posted by Douglas Flandro on Oct 19, 2016, 2:20 pm

I would like to see some more options added to this credit to encourage walking on the project site such as tables and benches with solar powered charging stations, outdoor theaters, performance...

Last reply: Kristina Bach, Nov 8, 2016, 8:37 am

Maximum frontage without windows on primary facade

Pilot-Credits PC14: Walkable Streets
posted by Margaret Montgomery on Jan 20, 2016, 5:26 pm

The project I'm testing this pilot credit with meets all but requirement 8, so the pilot credit has been "met". We've all worked on projects where an active use, lively peeks into a building's...

Last reply: Qiongwen Kong, Nov 4, 2016, 4:25 pm

Garage/service openings with driveway crossings at sidewalk

Pilot-Credits PC14: Walkable Streets
posted by Qiongwen Kong on Nov 2, 2016, 11:11 am

This is in regards to the requirements 6 and 7.

6 - No more than 20% of the street frontage includes garage or service...

Alternative Walkability Features

Pilot-Credits PC14: Walkable Streets
posted by Emily Loquidis on Jul 22, 2016, 7:35 am

Has anyone successfully submitted alternative approaches other than the 9 factors listed within the credit requirements.

Last reply: Qiongwen Kong, Nov 1, 2016, 4:50 pm

project with courtyard walls...

Pilot-Credits PC14: Walkable Streets
posted by Frank Yao on Oct 25, 2016, 10:09 am

We have a small project with a courtyard with an area pretty much doubling the building footprint which has a wall (concrete wall, not a fence) all along the peripheral yard. And part of wall is...