Log in
Forum » CI-v4 EQc5
Topic

Temperature Sensor

CI-v4 EQc5: Thermal comfort
posted by Edgar Arevalo on May 17, 2023, 4:45 pm

I have a dilemma for a library project i'm working on.  It seems the MEP designer added temperature sensors (wall or ceiling mounted) in the reading areas.  These don't have any way to adjust...

Agile Working with specific temperature as Thermal Comfort Control

CI-v4 EQc5: Thermal comfort
posted by Anik Bastien on Jan 27, 2023, 1:30 pm

Hello,

Someone posted a similar question, but we pushed it a little bit futher and we would like to have your imput:

We’re planning to design several office buildings with open...

Open-office workstations thermal comfort control

CI-v4 EQc5: Thermal comfort
posted by Zsuzsanna Gidro on Feb 5, 2019, 7:00 am

Hi!

We have a project with open office areas including workstations with 12 people (2 desks facing each other counting as one workstation). The HVAC system is zoned in areas containing in...

Last reply: Seema Pandya, Sep 29, 2020, 6:07 pm

Individual Thermal Comfort Controls- Open office

CI-v4 EQc5: Thermal comfort
posted by Mariana del Valle on Apr 23, 2020, 10:52 pm

  Hi!

Is there a different alternative to providing individual thermal comfort controls for each workstation in open areas? assuming that the HVAC design is divided by thermal zones, so it...

Last reply: Tyler Thumma, Apr 30, 2020, 1:12 pm

Agile Working as Thermal Comfort Control

CI-v4 EQc5: Thermal comfort
posted by Matthew Dempsey on Oct 14, 2019, 11:31 am

Hi, 

We have a commercial office which is an agile working space. Would this count as a thermal comfort control, since occupants can move to another workstation if they are uncomfortable...

Last reply: Karen Joslin, Apr 28, 2020, 1:36 am

Sample documents for this credit

CI-v4 EQc5: Thermal comfort
posted by nasrin belim on Apr 25, 2020, 2:24 am

Hi LEED User

Please if available than share the sample documentation or chart for CIv4-EQc5 Thermal Comfort

thanks 

Last reply: Karen Joslin, Apr 28, 2020, 1:30 am

Thermal Comfort Controls for 100% of Shared Multioccupant Sapces

CI-v4 EQc5: Thermal comfort
posted by Chanyang Shin on Aug 7, 2018, 10:33 am

Hi,

I'm a mechanical engineer working on a project now that is 100% open offices space, with some large conference rooms, and various "huddle" rooms (no individual offices).  The huddle...

Operable Windows

CI-v4 EQc5: Thermal comfort
posted by Sondra Camis on Apr 3, 2017, 6:46 pm

In the Bird's Eye View comments above, it states that an operable window is considered a control for one person. I seem to remember in previous versions of LEED we were able to show that all...

Last reply: David Posada, Oct 27, 2017, 9:56 pm

Thermal controls for 50% occupants

CI-v4 EQc5: Thermal comfort
posted by Gabriela Mena on Jul 20, 2017, 1:40 pm

Hi,

We have a project in Mexico City, the system is VRF and for the interior spaces we have Fan coil units, approximately 60% of the project area is open office space and it is...

Last reply: Parker Hall, Aug 8, 2017, 12:40 pm

Blind

CI-v4 EQc5: Thermal comfort
posted by Ameet AA on Oct 17, 2016, 10:13 pm

Hi,

Can blind be considered as control for thermal comfort? Thanks.

Last reply: Tristan Roberts, Jan 17, 2017, 2:41 pm