CSR SampleCI-v4 MRc4: Building product disclosure and optimization - sourcing of raw materialsposted by Edgar Arevalo on Jun 15, 2023, 11:52 am
I'm reviewing shop drawings for LEED info. The contractor provides a sample of the BPDO calculator filled out with data that is suppose to reflect information from the documents attached to the... Last reply: Paula Melton, Jul 14, 2023, 10:55 am |
|
Furniture reuseCI-v4 MRc4: Building product disclosure and optimization - sourcing of raw materialsposted by Marie Miller on Apr 25, 2023, 1:40 pm
Hello - I'm working on a TI project and the client is reusing over half their furniture. I know I include this in the calculator, but do I use the value of the furniture when it was purchased? Is... Last reply: Summer Minchew, Apr 27, 2023, 9:49 am |
|
Extended Producer Responsibility- Same Producer, Multiple ProductsCI-v4 MRc4: Building product disclosure and optimization - sourcing of raw materialsposted by Amanda Gillen on Jul 9, 2018, 11:53 am
I have several products that are specified for my project which are from the same manufacturer. For example, the same manufacturer makes the carpet and the laminate flooring. This manufacturer... Last reply: Allison Smith, Jul 9, 2018, 2:17 pm |
|
one product both meet two criteria in option2.CI-v4 MRc4: Building product disclosure and optimization - sourcing of raw materialsposted by Renaud Gay on Feb 24, 2017, 2:00 ama LEED tech team lead in this forum? Log in or register to post comments Michelle Rosenberger Partner ArchEcology LEEDuser Premium Member 523 thumbs up April 21, 2018- 11:16 am Hi all, Since this thread,... Last reply: Allison Smith, Apr 22, 2018, 3:09 pm |
|
Biobased materials- Manufacturer declared conformanceCI-v4 MRc4: Building product disclosure and optimization - sourcing of raw materialsposted by Danna Richey on Mar 7, 2018, 9:41 am
We have a project on which we're using a large amount of wool, and we'd like to be able to take credit for biobased materials. Since we're unable to find any... |
|
MRpc102-Legal WoodCI-v4 MRc4: Building product disclosure and optimization - sourcing of raw materialsposted by Kristopher Croghan on Jul 7, 2017, 3:51 pm
So in doing some research, are the following certifications acceptable for the legal... Last reply: Karen Elliott, Sep 13, 2017, 10:03 am |
|
BPDO Calculator / Total materials costCI-v4 MRc4: Building product disclosure and optimization - sourcing of raw materialsposted by Kevin Wilcox on Jul 25, 2017, 5:04 pm
Looking for clarification on ‘Total materials cost’ number from BPDO calculator (Materials tab). Last reply: Allison Smith, Aug 7, 2017, 4:06 pm |
|
BPDO calculator and FurnitureCI-v4 MRc4: Building product disclosure and optimization - sourcing of raw materialsposted by Michelle Rosenberger on May 11, 2017, 5:27 pm
As I understand it, IDC projects are required to use Actual Materials cost and to include furniture in that cost. The version 4 BPDO calculator indicates furniture is Optional and asks for Actual... Last reply: Michelle Rosenberger, May 11, 2017, 7:08 pm |
|
Valuation of Recycled ContentCI-v4 MRc4: Building product disclosure and optimization - sourcing of raw materialsposted by Rebecca Pinto on Aug 23, 2016, 5:16 pm
I would like some clarification on how to calculate... Last reply: Paula Melton, Aug 25, 2016, 2:53 pm |