Log in
Forum » CI-v4 EAc4
Topic

EAc4: Renewable energy production- 100% renewable, local energy product from local power provider

CI-v4 EAc4: Renewable energy production
posted by Kevin Gilleran on Aug 22, 2018, 1:26 pm

Hi,

My client has access to the following program:

Pre-purchase a 20 year commitment to a 100% renewable, local energy product from the local power provider (EverGreen from Sonoma...

Last reply: Marcus Sheffer, Nov 27, 2020, 12:48 pm

PV installation built and commissioned prior to Occupancy

CI-v4 EAc4: Renewable energy production
posted by Gary Shlifer on Feb 19, 2019, 8:08 pm

Our project is a 6 story office building, 250,000 sq feet. It is underconstruction. The owner wishes to 'resurrect' a PV covered parking...

Last reply: Marcus Sheffer, Sep 3, 2019, 3:15 pm

Wastewater Plant Methane-powered Fuel Cell

CI-v4 EAc4: Renewable energy production
posted by on Oct 30, 2018, 1:25 pm

I have a project on a campus whose microgrid is in part served by a large fuel cell. The fuel cell is powered by waste methane gas purchased from a nearby wastewater treatment plant. The...

Last reply: Marcus Sheffer, Oct 30, 2018, 1:42 pm

Selling renewable energy

CI-v4 EAc4: Renewable energy production
posted by Borja Sánchez on Jan 25, 2018, 8:15 am

Our project has a photovoltaic array that generates electricity which it´s sent totally to the grid, not being consumed directly in the building. This electricity it’s not sold to a specific user...

Last reply: Marcus Sheffer, Jan 25, 2018, 12:38 pm

Estimate annual energy use of the office outside U.S.

CI-v4 EAc4: Renewable energy production
posted by Ameet AA on Nov 23, 2017, 9:28 pm

The project is in Ho Chi Minh city - tropical climate, so there is no demand for heating and the office will use only electricity.

According to reference guide, for project not doing...

Last reply: Marcus Sheffer, Nov 24, 2017, 12:57 pm

Renewable Energy

CI-v4 EAc4: Renewable energy production
posted by Maria Glädt on Dec 17, 2014, 2:05 pm

See quotation from LEED-CI. "Use tenant...

Last reply: Marcus Sheffer, Aug 28, 2017, 10:22 am

Renewable Energy in CS project

CI-v4 EAc4: Renewable energy production
posted by Sara Johansson on Mar 29, 2017, 9:36 am

Is the tenant obliged to install additional...

Last reply: Marcus Sheffer, Aug 28, 2017, 10:17 am

University Campus with Solar, not in Project LPB

CI-v4 EAc4: Renewable energy production
posted by Sara Zoumbaris on Mar 16, 2017, 1:22 pm

Our project is the renovation of an existing university building. There is no...

Last reply: Marcus Sheffer, Aug 28, 2017, 10:11 am

Double- Counting of Renewable Energy

CI-v4 EAc4: Renewable energy production
posted by Bharath Ravuru on Aug 10, 2017, 8:42 am

Hi,

We are going with solar panels on site at our facility. Can I use the...

Last reply: Marcus Sheffer, Aug 28, 2017, 10:09 am