Topic | Recent |
---|---|
EAc4: Renewable energy production- 100% renewable, local energy product from local power providerCI-v4 EAc4: Renewable energy productionposted by Kevin Gilleran on Aug 22, 2018, 1:26 pm
Hi, My client has access to the following program: Pre-purchase a 20 year commitment to a 100% renewable, local energy product from the local power provider (EverGreen from Sonoma... Last reply: Marcus Sheffer, Nov 27, 2020, 12:48 pm |
|
PV installation built and commissioned prior to OccupancyCI-v4 EAc4: Renewable energy productionposted by Gary Shlifer on Feb 19, 2019, 8:08 pm
Our project is a 6 story office building, 250,000 sq feet. It is underconstruction. The owner wishes to 'resurrect' a PV covered parking... Last reply: Marcus Sheffer, Sep 3, 2019, 3:15 pm |
|
Wastewater Plant Methane-powered Fuel CellCI-v4 EAc4: Renewable energy productionposted by on Oct 30, 2018, 1:25 pm
I have a project on a campus whose microgrid is in part served by a large fuel cell. The fuel cell is powered by waste methane gas purchased from a nearby wastewater treatment plant. The... Last reply: Marcus Sheffer, Oct 30, 2018, 1:42 pm |
|
Selling renewable energyCI-v4 EAc4: Renewable energy productionposted by Borja Sánchez on Jan 25, 2018, 8:15 am
Our project has a photovoltaic array that generates electricity which it´s sent totally to the grid, not being consumed directly in the building. This electricity it’s not sold to a specific user... Last reply: Marcus Sheffer, Jan 25, 2018, 12:38 pm |
|
Estimate annual energy use of the office outside U.S.CI-v4 EAc4: Renewable energy productionposted by Ameet AA on Nov 23, 2017, 9:28 pm
The project is in Ho Chi Minh city - tropical climate, so there is no demand for heating and the office will use only electricity. According to reference guide, for project not doing... Last reply: Marcus Sheffer, Nov 24, 2017, 12:57 pm |
|
Renewable EnergyCI-v4 EAc4: Renewable energy productionposted by Maria Glädt on Dec 17, 2014, 2:05 pm
See quotation from LEED-CI. "Use tenant... Last reply: Marcus Sheffer, Aug 28, 2017, 10:22 am |
|
Renewable Energy in CS projectCI-v4 EAc4: Renewable energy productionposted by Sara Johansson on Mar 29, 2017, 9:36 am
Is the tenant obliged to install additional... Last reply: Marcus Sheffer, Aug 28, 2017, 10:17 am |
|
University Campus with Solar, not in Project LPBCI-v4 EAc4: Renewable energy productionposted by Sara Zoumbaris on Mar 16, 2017, 1:22 pm
Our project is the renovation of an existing university building. There is no... Last reply: Marcus Sheffer, Aug 28, 2017, 10:11 am |
|
Double- Counting of Renewable EnergyCI-v4 EAc4: Renewable energy productionposted by Bharath Ravuru on Aug 10, 2017, 8:42 am
Hi, We are going with solar panels on site at our facility. Can I use the... Last reply: Marcus Sheffer, Aug 28, 2017, 10:09 am |