Log in
Forum » CI-v4 EAc3
Topic

Metering Requirements

CI-v4 EAc3: Advanced Energy Metering
posted by Ricardo Sá on Oct 21, 2019, 9:43 am

Dear All,

We’re currently trying to certify a project with the following characteristics:

  • the tenant pursuing certification occupies the vast majority of...

Last reply: Marcus Sheffer, Oct 21, 2019, 6:32 pm

Is data-sharing letter needed from Owner?

CI-v4 EAc3: Advanced Energy Metering
posted by Renee Shirey on Jun 26, 2019, 10:43 am

In LEED NC-v4 - EAc Building-Level Energy Metering a letter is required from the Owner to state their commitment to share energy consumption data. In the credit template there is a...

Last reply: Marcus Sheffer, Jun 26, 2019, 10:48 am

Tracking energy consumption data and electrical demand data

CI-v4 EAc3: Advanced Energy Metering
posted by Laura Charlier on May 31, 2016, 4:34 pm

Hi there,
Does anyone have the link to track the energy consumption data and electrical demand data that is required to submit to USGBC for 5 years?

Thanks

Last reply: Marcus Sheffer, Sep 24, 2018, 11:05 am

OPTION 1. METERING- tenant level meters

CI-v4 EAc3: Advanced Energy Metering
posted by Matt Edwards on Aug 28, 2018, 2:49 pm

Our tenant space consists of 1 full floor and part of another floor in a high rise office building.  We would like to know whether the design as described below would meet the requirements for...

Last reply: Marcus Sheffer, Sep 7, 2018, 10:31 am

Extrapolated Value for Advanced Metering?

CI-v4 EAc3: Advanced Energy Metering
posted by Jais Kwon on Aug 23, 2018, 8:33 am

Hi, 

We can meter/measure all other energy consumption but we have fin tubes (heating) in our tenant space that we cannot meter. Can we meter the value from the base of the...

Last reply: Marcus Sheffer, Aug 23, 2018, 3:25 pm

Advanced Enegy Metering Credt form- Option # 2

CI-v4 EAc3: Advanced Energy Metering
posted by Michael Archer on Aug 21, 2018, 12:49 pm

Is "Permanent" an acceptable response to 'Meter Type' in the Advanced Meters Table of the Advance Metering Credit form?  If not, what is the form looking for?

Thank you.

percentage of energy type or overall

CI-v4 EAc3: Advanced Energy Metering
posted by Craig Flandermeyer on Aug 1, 2018, 4:57 pm

The building in question has both electric and gas usage.  The project is attempting to submeter the chillers to satisfy the tenant level requirement for advanced metering.  It is estimated that...

Last reply: Marcus Sheffer, Aug 3, 2018, 1:33 pm

Client renting the entire building

CI-v4 EAc3: Advanced Energy Metering
posted by Katarzyna Toczynska on Jul 12, 2018, 8:21 am

Hi,

I have a CI project where an entire building is going to be leased for our Client. The building has all the systems built (including ventilation and VRF system). Our Client will manage...

Last reply: Katarzyna Toczynska, Jul 16, 2018, 10:37 am

What is the base building service water?

CI-v4 EAc3: Advanced Energy Metering
posted by JASON NIEN on Feb 26, 2018, 9:07 pm

In the LEED CI V4 standard. Base building service water heating does not need to be metered.So someone can tell me what kind of use belongs to...

Last reply: Paula Melton, Mar 8, 2018, 11:50 am

LEEDv4 CI Office space- VRF software to calculate fan energy

CI-v4 EAc3: Advanced Energy Metering
posted by Jane Christen on Oct 20, 2017, 11:44 am

We have a LEEDv4 CI Commercial Office space where in addition to those already metered, lighting, plug, etc., the other end uses are heating, cooling, and fan energy. The mechanical system is VRF...