Log in
Forum » CI-v4 EAp3
Topic

Fundamental refrigerant management for a "District Energy System"

CI-v4 EAp3: Fundamental Refrigerant Management
posted by Ralph Bicknese on Jan 18, 2018, 12:12 pm

To be clear, does the upstream equipment in a District Energy System need to be considered for the prerequisite or only for the enhanced refrigerant management credit?  Based on the "project type...

Cooling Towers

CI-v4 EAp3: Fundamental Refrigerant Management
posted by Laura Charlier on Nov 2, 2017, 1:48 pm

If cooling tower is being replaced as part of project, does that need to be included in calcs?

Existing Chillers in Basement (not in project boundary)

CI-v4 EAp3: Fundamental Refrigerant Management
posted by Heather Zeto on Aug 18, 2017, 11:14 am

Our project is a 4-floor fit-out of a hospital tower (Less than 200,000 SF of an existing 8 Million SF building). There are (2) large chillers in the basement (not part of our project scope)...

Last reply: Ashwini Arun, Aug 28, 2017, 6:14 pm

Existing small HVAC&R units

CI-v4 EAp3: Fundamental Refrigerant Management
posted by Mercedes Ferreira on Apr 7, 2017, 7:56 pm

For the Fundamental Refrigerant Management credit under the ID+C rating system, when the requirement says, "Existing small HVAC&R units (defined as containing less than 0.5 pound (225 grams)...

Last reply: Ashwini Arun, Aug 28, 2017, 5:31 pm