Topic

Would Process load considered as Plug Load?

EBOM-v4 EAc5: Advanced Energy Metering
posted by ERM Korea on Jul 7, 2021, 3:57 am

Hello!

To implement Advanced energy metering and Builidng Energy Management System (BEMS), Energy audit Level II was conducted.

Based on the Energy audit Level II. our result was as...

Baseline for Advance Metering

EBOM-v4 EAc5: Advanced Energy Metering
posted by Patricia Andrasik on Jun 8, 2018, 3:27 am

If portfolio manager is used to develop an energy baseline for both demand and consumption for Advanced Metering, is this baseline  different from the one developed in the prerequisite?

Last reply: Patricia Andrasik, Jul 3, 2018, 4:31 pm

Energy Submetering

EBOM-v4 EAc5: Advanced Energy Metering
posted by VISHESH AGARWAL on Aug 19, 2016, 8:00 am

I am working on EB Project in LEED V4. In V4 the advance sub-metering is required
1. Chilled water System: Chiller and Chilled water pumps
2. Condenser Water Pumps: Cooling tower,...

Last reply: Ben Stanley, Oct 5, 2016, 5:28 pm

Energy Metering for Multi-tenant building

EBOM-v4 EAc5: Advanced Energy Metering
posted by Gabriela Crespo on Jul 7, 2016, 11:59 am

Dear all,

We are working on a LEED EB project that wants to explore this credit, I understand the requirements are to monitor all energy sources, as the pre-requisite states, and...

Last reply: Dave Hubka, Jul 7, 2016, 12:38 pm

Energy Metering

EBOM-v4 EAc5: Advanced Energy Metering
posted by Zachary Hayes on Jun 22, 2016, 10:51 am

Is it acceptable to use energy monitoring software to meet this credit or does it need to be a physical meter? My facility already monitors energy usage through our facility management program,...

Last reply: Dave Hubka, Jun 22, 2016, 1:02 pm