Part of HVAC considered as Process for clean rooms?

NC-2009 EAp2:Minimum Energy Performance
posted by  Valentin Grimaud  on 

Dear community, My project includes extraordinary energy consumption for HVAC resulting from maintaining clean room environments – specifically the amount of air changes and pressure requirements

3
Thermal Engineer
TERAO Green Building Engineering
LEEDuser Basic Member
28 thumbs up
Fri Mar 1, 2013, 7:18 pm

When do we start submitting information to achieve MRc2 credits

NC-2009 MRc2:Construction Waste Management
posted by  Dulian Terry-Swaby  on 

Hi, We are currently in phase #2 of demolition of a hotel that we plan to convert to a 4 star resort. My question is: When should we start submitting information to meet this credit?

3
Architectural Coordinator
Dart Realty (Cayman) Limited
LEEDuser Basic Member
0 thumbs up
Fri Mar 1, 2013, 1:50 pm

implementation costs (soft costs)

Pilot-Credits EQpc24:Acoustics
posted by  Emmanuel Pauwels  on 

We are considering this credit for a New Construction Project. Before making a decision we need to estimate the engineering cost involved for this credit.

4
Default Avatar
Corgan Associates
LEEDuser Basic Member
0 thumbs up
Thu Feb 28, 2013, 10:01 pm

Discrepancy between LEED form and scorecard on LEED Online

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Phil Meyer  on 

We are documenting 4 points for WEc1 Water Efficient Landscaping in the completed LEED online form (compliance button in form even notes 4 pts) for a LEED 2009 NC project.

3
Thu Feb 28, 2013, 5:43 pm

LEEDv2009-IDc1: Green Education (Energy Dashboard)

NC-2009 IDc1:Innovation in Design
posted by  Dion Serra  on 

I am working on a LEED-NC project for a university where we will be implementing an energy dashboard website, similar to Lucid Technologies or QA Graphics.

3
Default Avatar
Intern Architect
LEEDuser Basic Member
0 thumbs up
Thu Feb 28, 2013, 5:17 pm

Can I change the project name?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Maria Porter  on 

Our project was registered a couple of years ago, we have passed precertification (CS), and we have passed Design phase.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Feb 28, 2013, 3:39 pm

Campus Energy System

NC-2009 EAp2:Minimum Energy Performance
posted by  Therese Malm  on 

Hi, We are working with a building in Norway that has a ground-source heat pump as its main heating system and it is also connected to communal district heating as a back-up.

10
Default Avatar
WSP Environmental
LEEDuser Basic Member
6 thumbs up
Thu Feb 28, 2013, 3:38 pm

Air Speed Values exceed 40 fpm

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Barbara McCrary  on 

I've submitted this credit to USGBC and it was rejected.

5
Default Avatar
Engineer
Tighe & Bond
LEEDuser Basic Member
7 thumbs up
Thu Feb 28, 2013, 2:33 pm

How to send the documentation for the campus credits

LEED Guidance for Campuses and Multiple Buildings
posted by  Alicia Villanueva  on 

We are certifying 2 buildings within a Master Site and we have registered both of them: Building A Building B Then, we have linked them with the Block Registration Tool. We don't know how to up

5
Technical Customer Service Specialist
GBCI
LEEDuser Premium Member
105 thumbs up
Thu Feb 28, 2013, 2:02 pm

LEED Canada V1.1 and LEED Canada 2009. Credits MRc4 and MRc7

NC-2009 MRc7:Certified Wood
posted by  Keith Robertson  on 

In the LEED Canada reference guide V1.0, page 295 for the credit MRc4, it is stated under “Synergies and Trade-Offs […] Recycled content materials cannot be included in calculations for MR Credits

6
Default Avatar
President
Solterre Inc.
LEEDuser Premium Member
47 thumbs up
Wed Feb 27, 2013, 8:06 pm