Topic | Recent |
---|---|
Question about Option 4. Parking Under CoverEBOM-v4 SSc3: Heat Island Reductionposted by J.W. Shin on Oct 17, 2022, 3:42 am
We are working on a LEED O+M: existing building project with a multilevel parking space (10th floor mechanical parking) attached to the main building. There is no parking space on the top... Last reply: emily reese moody, Oct 30, 2022, 6:20 pm |
|
LEED V4 EBOM Heat Island Reduction- ParkingEBOM-v4 SSc3: Heat Island Reductionposted by on Mar 12, 2021, 8:33 am
Hello, I have question regarding LEED... Last reply: emily reese moody, May 16, 2021, 7:13 pm |
|
Heat Island Reduction RoofEBOM-v4 SSc3: Heat Island Reductionposted by Nitesh Kumar J on Jun 2, 2017, 8:02 am
What if there is a Shed on the Terrace? Last reply: Trista Brown, Mar 22, 2019, 8:34 pm |
|
SRI value for concreteEBOM-v4 SSc3: Heat Island Reductionposted by LEED Pro Consultant on Aug 26, 2014, 2:02 pm
Hi, Last reply: Salman Jafri, Mar 18, 2019, 9:13 am |
|
Solar Panels on RoofEBOM-v4 SSc3: Heat Island Reductionposted by Denaye Hinds on Feb 13, 2019, 7:45 pm
If there are solar panels covering the roof - does this comply for Heat Island Reduction? If so, is there additional information required to be shared regarding the solar panels installed? Last reply: Trista Brown, Feb 13, 2019, 7:57 pm |
|
Option 4 with underground parkingEBOM-v4 SSc3: Heat Island Reductionposted by Elodie DUMAS on May 7, 2015, 11:08 am
Does Option 4 works with underground parking ? Last reply: April Wang, Sep 5, 2018, 5:02 am |
|
Testing of Existing Old Roof MaterialEBOM-v4 SSc3: Heat Island Reductionposted by ARDOR GREEN on Oct 2, 2017, 11:37 pm
We would like to take a sample of 10 year old existing roofing and test it in a laboratory for the aged... Last reply: ARDOR GREEN, Oct 26, 2017, 5:23 am |
|
Heat Island ReductionEBOM-v4 SSc3: Heat Island Reductionposted by VISHESH AGARWAL on Aug 20, 2016, 7:59 am
Dear All, Can I take option-2: Roof (1 Points) and option-4: Parking Under Cover (1 Points) Simultaneously for achieving 2 points under this category OR we need to use option-3 for... |
|
EP- Option 3EBOM-v4 SSc3: Heat Island Reductionposted by Lorne Mlotek on Jul 3, 2014, 7:18 pm
This option states achieve both EP options 1 and 2. How does this make sense. Are you able to earn more than one EP per credit. Even so, the max EP per project is 2 and thus EP 1+2 would... Last reply: Levi Jimenez, Aug 8, 2014, 3:09 pm |