Forum quick links
Using EMS to calculate some End-Use Energy
NC-v4 EAc3:Advanced energy meteringposted by Melissa Crowe on
Hi All
We have metering set up for most of the end-uses that represent over 10% of total energy but for some equipment is it not cost effective or practical.
LTc5 Quality Transit - is and exemplary performance path avaiable?
CS-v4.1 LTc5:Access to Quality Transitposted by Susan Di Giulio on
We have a LEED-CS project adjacent to a major regional transit hub and it is actually possible that we could double the 360 wkday trips/216 wkend trips required for 6 points.
Option 2 - Is there still a minimum sample area requirement?
NC-v4 EQc4:Indoor air quality assessmentposted by Daniel Smith on
I am quoting to provide Option 2 IAQ testing for my first V4 BD+C project.
Manufacturing Plant Energy Consumption
NC-v4 EAp2:Minimum energy performanceposted by Sofia Barahona on
We are working on a project that is pursuing LEED v4: New Construction.
Walkable Project Site
NC-v4 INc1:Innovationposted by Rebecca Aarons-Sydnor on
We are looking at this for a building that is on a plaza and next to green space (athletic field) and a body of water (lake). There is only pedestrian and bike access to the building via the
Effects of Construction/Renovation on Employee Productivity
posted by Heather Holdridge on
Does anyone have any research studies they could share on the effect of construction/renovation noise and activity on employee productivity? I'm trying to make a case for the measurable negat
Reasonable LEED Boundaries
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Marlen Aleman on
Hi, the scope of the project is to renovate the 3rd floor of a 5 storey building (all floors will be renovated eventually but the client wants to certify each floor as we go).
Impact of Landscaping on Water Consumption
EBOM-v4.1 WEc1:Water Performanceposted by Shri Kiruba on
Hello,